Federal Contracting

Federal construction insurance requirements by agency

The FAR floor with the actual dollar amounts, the subcontractor proof-of-insurance rule most primes underestimate, and an honest matrix of what GSA, USACE, NAVFAC, VA and DOE add on top.

In one paragraph

Contracts Connected reads each certificate and endorsement as it arrives and checks the coverage and limits against what that specific federal contract requires, from the FAR 28.307-2 minimums to what GSA, USACE, NAVFAC, VA and DOE add on top.

On this page
  1. What insurance does a federal construction contract require?
  2. When does FAR 52.228-5 actually apply to your contract?
  3. What are the FAR minimum insurance amounts, line by line?
  4. What does the FAR require you to do about subcontractor insurance?
  5. Why do insurance requirements vary from one agency to the next?
  6. How do federal construction insurance requirements compare across agencies?
  7. What does GSA require beyond the FAR baseline?
  8. What do USACE and NAVFAC require beyond the FAR baseline?
  9. What does the VA require beyond the FAR baseline?
  10. What does DOE require beyond the FAR baseline?
  11. How do you confirm what your specific contract requires?
  12. What does this page not cover?
  13. How does Contracts Connected help a federal GC keep insurance compliant?
  14. Frequently asked questions

What insurance does a federal construction contract require?

A federal construction contract requires, at minimum, workers’ compensation as required by applicable federal and state law, employer’s liability coverage of at least $100,000, general liability bodily injury coverage of at least $500,000 per occurrence, and automobile liability of at least $200,000 per person, $500,000 per occurrence, and $20,000 per occurrence for property damage. Those minimums are set at FAR 28.307-2. They are floors, not targets, and the specific contract in front of you almost certainly requires more.

That last point is the one worth internalizing before anything else on this page. The FAR amounts are the default the regulation supplies when the contract is silent. The number that actually binds you is the one written into the contract Schedule, and a contracting officer is explicitly authorized to require more coverage and higher limits than the FAR floor.

The volume of work this touches is not small. According to federal award data published on USAspending.gov, agencies obligated roughly $51.1 billion on construction contracts, NAICS sector 23, in fiscal year 2025, spread across 83,766 contract transactions. Every one of those that is fixed-price, exceeds the simplified acquisition threshold, and puts a crew on a government installation carries an insurance clause with a prime contractor’s name on it.

When does FAR 52.228-5 actually apply to your contract?

FAR 52.228-5, Insurance, Work on a Government Installation, is required when three conditions are met at once: the contract is fixed-price, the contract amount is expected to exceed the simplified acquisition threshold, and the contract will require work on a government installation. That prescription is at FAR 28.310, and the simplified acquisition threshold is currently $350,000 under the definition at FAR 2.101.

Two exceptions carve work out. The clause is not required when only a small amount of work is needed on the installation, which the regulation illustrates as a few brief visits per month, and it is not required when all work on the installation will be performed outside the United States and its outlying areas. Both exceptions are discretionary in the other direction as well: FAR 28.310(b) lets the contracting officer insert the clause anyway when doing so is in the government’s interest.

The practical read is that the clause is close to universal on domestic federal construction. A fixed-price construction contract over $350,000 performed on a base, a federal building, a VA medical center, or a national laboratory site clears all three conditions without much argument. If you build for the federal government, assume the clause is in your contract and go confirm it rather than assuming it out.

What are the FAR minimum insurance amounts, line by line?

FAR 28.307-2 sets five categories of liability coverage with specific dollar minimums for three of them. The table below reproduces each one as the regulation states it. These amounts are current in the eCFR as of July 29, 2026 and have been stable for a long time, which is itself part of the story: they are low relative to what any real construction subcontract requires today.

Coverage typeFAR citationMinimum amount the FAR setsWhat the regulation actually says
Workers' compensation and employer's liabilityFAR 28.307-2(a)Employer's liability of at least $100,000Contractors must comply with applicable federal and state workers' compensation and occupational disease statutes. The $100,000 employer's liability floor does not apply in states with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
General liability, bodily injuryFAR 28.307-2(b)(1)At least $500,000 per occurrenceThe contracting officer is directed to require bodily injury liability insurance written on the comprehensive form of policy.
General liability, property damageFAR 28.307-2(b)(2)No stated minimumProperty damage liability insurance is required only in special circumstances as determined by the agency. This is a real gap in the baseline, and it is a common place for a solicitation to add a requirement.
Automobile liabilityFAR 28.307-2(c)$200,000 per person, $500,000 per occurrence for bodily injury, and $20,000 per occurrence for property damageWritten on the comprehensive form, covering all automobiles used in connection with performing the contract. For vehicles operated outside the United States, coverage must instead be commensurate with local legal requirements and sufficient for normal and customary claims.
Aircraft public and passenger liabilityFAR 28.307-2(d)$200,000 per person and $500,000 per occurrence for bodily injury other than passenger liability, $200,000 per occurrence for property damage, and passenger liability of at least $200,000 multiplied by the number of seats or passengers, whichever is greaterApplies when aircraft are used in connection with performing the contract, which on construction work most often means survey, inspection, or lift operations.
Vessel liabilityFAR 28.307-2(e)No stated minimumWhen performance involves use of vessels, the contracting officer requires vessel collision liability and protection and indemnity liability insurance as determined by the agency. Relevant to marine and waterfront construction.

One more baseline rule sits outside the dollar amounts and gets missed. Under FAR 28.301(b), the minimum amounts required by the regulation may be reduced when a contract is to be performed outside the United States and its outlying areas. Overseas work is not automatically held to the domestic floor.

What does the FAR require you to do about subcontractor insurance?

FAR 52.228-5(c) requires the prime contractor to push the clause down into subcontracts that involve work on a government installation, to require those subcontractors to carry the insurance the contract specifies, and to keep a copy of every subcontractor’s proof of required insurance available for the contracting officer on request. This is the obligation that creates the most day-to-day work, and it is the one primes most often treat as a filing task rather than a contract requirement.

Here is the clause language itself:

The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

FAR 52.228-5(c), Insurance, Work on a Government Installation (JAN 1997)

Read what that actually obligates. It is not “collect certificates at onboarding.” It is maintain a copy of all subcontractors’ proofs of required insurance, and produce them on request, for the duration of performance. A subcontractor whose policy lapsed in month seven of a two-year job is a subcontractor whose proof you can no longer produce, and the request from the contracting officer does not arrive on a schedule you control.

The clause also carries its own front-end obligations on the prime. Before commencing work, the contractor must notify the contracting officer in writing that the required insurance has been obtained. The policies must contain an endorsement providing that any cancellation or material change adversely affecting the government’s interest is not effective for the period state law prescribes, or until 30 days after written notice to the contracting officer, whichever period is longer.

That last detail is worth flagging separately, because it is a common gap between what a contract requires and what a standard certificate shows. A certificate of insurance, including the ACORD 25 form, is evidence that a policy existed on the day the certificate was issued. It is not by itself proof that a cancellation endorsement was attached or that additional insured status was actually endorsed onto the policy. See the additional insured endorsement verification checklist→ for what to check on the endorsement rather than the certificate face.

Why do insurance requirements vary from one agency to the next?

Requirements vary because the FAR explicitly authorizes agencies to write their own. FAR 28.311-2 grants agencies that authority in a single sentence, and separately, FAR 28.306(b)(1) gives every individual contracting officer room to move above the floor on a specific contract.

Agencies may prescribe their own solicitation provisions and contract clauses to implement the basic policies contained in this subpart 28.3.

FAR 28.311-2, Agency solicitation provisions and contract clauses

Layered on top of that, FAR 28.306(b)(1) provides that when FAR 52.228-5 is required by FAR 28.310, the coverage specified in FAR 28.307 is the minimum insurance required and shall be included in the contract Schedule, and that the contracting officer may require additional coverage and higher limits. Two separate authorities, then: agencies can write clauses, and contracting officers can raise limits contract by contract.

The result is that the FAR floor is genuinely uniform across the federal government and almost nothing above it is. According to USAspending.gov data for fiscal year 2025, the Department of Defense alone accounted for roughly $31.4 billion of the $51.1 billion in federal construction obligations, about 62 percent, and the remaining 38 percent was spread across more than a dozen civilian agencies each operating under its own supplement.

How do federal construction insurance requirements compare across agencies?

The matrix below is the core reference on this page. It maps each agency to its acquisition supplement, the insurance clause that applies beyond the FAR baseline, what that clause actually adds, and whether the supplement sets its own dollar minimums. The honest headline: only GSA adds a substantive coverage requirement in its published regulation. The others add approval and process requirements, and none of the five sets construction insurance dollar limits in its supplement.

Fiscal year 2025 construction obligation figures are from USAspending.gov, NAICS sector 23, awarding agency and sub-agency, retrieved July 29, 2026.

AgencyAcquisition supplementInsurance authority beyond FAR 52.228-5What it adds beyond the FAR baselineOwn dollar minimums?FY2025 construction obligations
Baseline, every agencyFAR Subpart 28.3FAR 52.228-5, Insurance, Work on a Government Installation (JAN 1997)Maintain the kinds and amounts stated in the Schedule; written notice to the contracting officer before starting work; cancellation and material change endorsement; flow the substance down and maintain every subcontractor's proof of required insuranceYes. FAR 28.307-2 sets $100,000 employer's liability, $500,000 per occurrence general liability bodily injury, and $200,000 / $500,000 / $20,000 automobile$51.1B total, all agencies
GSAGSAR 528.310GSAR 552.228-5, Government as Additional Insured (JAN 2016), which supplements rather than replaces FAR 52.228-5Every insurance policy required under the contract other than workers' compensation must carry an endorsement naming the United States as an additional insured for operations performed under the contract, and the carrier must waive all subrogation rights against any of the named insured. Prescribed for contracts expected to exceed the simplified acquisition threshold that require work on a government installationNo. GSA adds an endorsement requirement, not a limit$1.44B (Public Buildings Service)
USACE (Army)AFARS Subpart 5128.3No Army-specific construction insurance clauseUnder AFARS 5128.301(b), where the Army retains contract administration the responsible contracting officer is the point of contact and contracting officers must review and approve the contractor's insurance program and coordinate with other interested agencies before acting on significant insurance matters. AFARS 5128.311-1 also lets the head of the contracting activity waive the DFARS cost-reimbursement clause requirementNo. Limits come from the individual solicitation$14.61B (Department of the Army)
NAVFAC (Navy)NMCARS Subpart 5228.3No Navy-specific construction insurance clauseNMCARS 5228.301 states Navy policy is to rely on the commercial insurance industry to the maximum extent practicable, and routes all indemnification matters to DASN(P) in advance of award. NMCARS 5228.301-90 authorizes DASN(P) to require or approve contract insurance. NMCARS 5228.307-90 states that in general the Navy will not assume liability of subcontractors to third partiesNo. Limits come from the individual solicitation$12.84B (Department of the Navy)
VAVAAR Subpart 828.3VAAR 852.228-71, Indemnification and Insurance (MAR 2018), prescribed at VAAR 828.306 for term or continuing contracts for ambulance, automobile and aircraft service, not for constructionFor the service contracts it does cover: broad indemnification of the government, insurance as a condition precedent to award, and coverage at the greater of applicable state and local requirements or $200,000 per person and $500,000 per occurrence bodily injury with $20,000 per occurrence property damage per vehicle. VAAR Part 836, which governs VA construction and architect-engineer contracts, contains no insurance provisions, so VA construction runs on the FAR baseline plus the solicitationYes, but only for the non-construction services the clause covers$3.55B
DOEDEAR Subpart 928.3 and DEAR 970.2803-2DEAR 970.5228-1, Insurance, Litigation and Claims (JUL 2013), inserted instead of FAR 52.228-7 in all management and operating contractsBonds and insurance must be as required by law or approved in writing by the contracting officer, in a form, amount and period the contracting officer requires or approves, and with insurers the contracting officer approves. Self-insurance requires approval under FAR 28.308. DEAR 928.301 routes DOE indemnification policy to FAR Part 50 and DEAR Part 950. Separately, 10 CFR 851 worker safety and health requirements govern contractor activities at DOE sitesNo. Amounts are whatever the contracting officer requires or approves$1.12B

Two structural observations that the matrix makes visible and that are easy to miss reading the regulations one at a time.

First, the direction of the agency overlays is not toward higher numbers. It is toward more approval. Army, Navy and DOE all reserve to a contracting officer or a designated official the right to review, approve, or dictate the insurance arrangement. That is a different compliance burden than a higher limit. A higher limit you buy once. An approval right means the government can question your program mid-performance.

Second, the agency with the smallest construction spend of the five, GSA at $1.44 billion in fiscal year 2025 against the Army’s $14.61 billion, has by a wide margin the most specific published insurance requirement. Spend does not predict regulatory specificity, so do not assume a large agency has a thicker rulebook.

What does GSA require beyond the FAR baseline?

GSA requires that the United States be named as an additional insured on every policy the contract requires other than workers’ compensation, and that the carrier waive all subrogation rights against any of the named insured. The clause is GSAR 552.228-5, Government as Additional Insured, and GSAR 528.310 directs contracting officers to insert it in solicitations and contracts expected to exceed the simplified acquisition threshold that require work on a government installation.

The clause states its own relationship to the FAR plainly: it supplements the requirements set forth in FAR 52.228-5 rather than replacing them. So on a GSA construction contract you carry the FAR baseline and the additional insured and waiver of subrogation requirements on top.

Each insurance policy required under this contract, other than workers’ compensation insurance, shall contain an endorsement naming the United States as an additional insured with respect to operations performed under this contract. The insurance carrier is required to waive all subrogation rights against any of the named insured.

GSAR 552.228-5(b), Government as Additional Insured (JAN 2016)

Two operational consequences follow, and both are documentation problems rather than coverage problems. Additional insured status and waiver of subrogation are endorsements. They live on the policy, not on the certificate, and a certificate that says “additional insured” in a remarks box is not the endorsement. On a GSA job you should expect to produce the endorsement form itself, for your own policies and for every subcontractor’s, and the waiver of subrogation has to be there too, which is a separate endorsement from additional insured status on most policies.

GSA’s construction work is concentrated in the Public Buildings Service, which obligated $1.44 billion on construction contracts in fiscal year 2025 according to USAspending.gov. Note also that GSAR Part 536, which covers GSA construction and architect-engineer contracting, contains no insurance provisions of its own, so GSAR 528.310 is the whole of the GSA overlay.

What do USACE and NAVFAC require beyond the FAR baseline?

Neither the Army nor the Navy sets construction insurance dollar minimums in its acquisition supplement. What both add is government control over the insurance arrangement rather than a specific number, which means the operative limits for a USACE or NAVFAC project come from the individual solicitation and its special contract requirements.

For the Army, AFARS 5128.301(b) provides that when more than one agency is involved and the Army retains contract administration functions, the contracting officer responsible for contract administration is the point of contact, and that contracting officers shall review and approve the contractor’s insurance program and coordinate with other interested agencies before acting on significant insurance matters. The rest of AFARS Subpart 5128.3 covers overseas workers’ compensation waiver authority, group insurance plan approval under cost-reimbursement contracts, and the notification path to Army Litigation Division when FAR 52.228-7(g) is triggered.

For the Navy, NMCARS 5228.301 states that Navy policy is to rely on the commercial insurance industry to the maximum extent practicable to protect contractors against risks arising under contracts, and that all matters concerning indemnification are referred to DASN(P) sufficiently in advance of contract award. NMCARS 5228.301-90 authorizes DASN(P) to require or approve contract insurance. Most relevant to a prime managing a sub base, NMCARS 5228.307-90 states that in general the Navy will not assume liability of subcontractors to third parties.

It is worth being explicit about what is not there. DFARS Subpart 228.3 addresses risk-pooling arrangements, overseas workers’ compensation waivers, group insurance plans, ground and flight risk for aircraft, and the cost-reimbursement clause at FAR 52.228-7, which by its own terms is used for contracts other than construction and architect-engineer services. DFARS Part 236, the construction part, contains no insurance provisions at all. There is no DoD-wide construction insurance schedule to look up.

That combination matters because of scale. The Department of the Army obligated $14.61 billion and the Department of the Navy $12.84 billion on construction contracts in fiscal year 2025 according to USAspending.gov, which together is roughly 54 percent of all federal construction obligations that year. More than half of federal construction dollars flow through two organizations whose insurance limits are set solicitation by solicitation rather than by published regulation. If you build for USACE or NAVFAC, the solicitation is not a formality to skim. It is the only place the number exists.

What does the VA require beyond the FAR baseline?

For construction, the VA adds nothing in its acquisition regulation. VAAR Part 836, which governs VA construction and architect-engineer contracts, contains no insurance provisions, and the VA’s insurance clause at VAAR 852.228-71 is prescribed at VAAR 828.306 only for term contracts or contracts of a continuing nature for ambulance, automobile and aircraft service. A VA construction contract therefore runs on the FAR baseline plus whatever the solicitation specifies.

This is a place where a general reference can mislead badly, so it is worth stating precisely. VAAR 852.228-71 is a real VA clause with real numbers in it. It requires satisfactory insurance coverage as a condition precedent to award, and it sets general liability and automobile liability at the greater of applicable state minimums or $200,000 per person and $500,000 per occurrence for bodily injury with $20,000 per occurrence for property damage, per vehicle used. Those figures match the FAR 28.307-2 automobile numbers. But the clause is a services clause. Applying it to a construction contract because it appears in the VA’s Part 828 would be a mistake.

The “or those below stipulated, whichever are the greater” construction in that clause is worth borrowing as a habit even where the clause does not apply. It is the correct default posture on any federal job: carry the higher of the contract requirement and the applicable state or local legal requirement, and never assume the federal floor preempts a state minimum.

One VA-specific factor does change how a prime manages insurance compliance there, even though it is not itself an insurance rule. VA construction work is heavily set aside for small business. According to USAspending.gov, of the $3.55 billion the VA obligated on construction contracts in fiscal year 2025, roughly $3.03 billion, about 85 percent, went to awards carrying a small business set-aside designation. A prime on a VA job is typically managing a subcontractor base of smaller firms, where lapsed policies and thin endorsement documentation are more common and the burden of the FAR 52.228-5(c) proof-of-insurance obligation is correspondingly heavier.

What does DOE require beyond the FAR baseline?

DOE’s distinctive insurance requirement is contracting officer approval of the arrangement itself, including the insurers. For management and operating contracts, DEAR 970.2803-2 directs the contracting officer to insert DEAR 970.5228-1, Insurance, Litigation and Claims, instead of FAR 52.228-7, and that clause requires the contractor to procure and maintain such bonds and insurance as required by law or approved in writing by the contracting officer, in a form and amount and for those periods the contracting officer may require or approve, and with sureties and insurers approved by the contracting officer.

That last element is the sharpest edge. Most federal insurance requirements care about the coverage. This one also reaches the carrier. A DOE management and operating contractor cannot simply meet the limits with any admitted carrier and consider the requirement satisfied.

The clause also handles reimbursement and disallowance in detail: costs of required or approved insurance are reimbursable, but the contractor is not reimbursed for liabilities where it failed to insure or maintain insurance as required by law, the contract, or written direction of the contracting officer, and separately for liabilities caused by managerial personnel’s willful misconduct, lack of good faith, or failure to exercise prudent business judgment. The clause also requires compliance with 10 CFR Part 719, Contractor Legal Management Requirements, where applicable.

For DOE work generally, DEAR 928.301 states that DOE policies and procedures for indemnification of DOE contractors are set forth in FAR Part 50 and DEAR Part 950 rather than in the insurance subpart, and DEAR 928.370 permits service-type insurance policies with contracting officer approval under defined conditions, including where commercial pure risk insurance is unavailable or unreasonably priced.

Two boundaries on all of that. DEAR 970.5228-1 is prescribed for management and operating contracts, which is a specific contract type covering site operations at the national laboratories and production sites, not for every construction contract DOE awards. A conventional fixed-price DOE construction contract will generally carry the FAR baseline instead. And 10 CFR 851, which governs worker safety and health for contractor activities at DOE sites, is a safety rule rather than an insurance rule, though it shapes the risk profile a carrier is underwriting. DOE obligated $1.12 billion on construction contracts in fiscal year 2025 according to USAspending.gov.

How do you confirm what your specific contract requires?

Start with the Schedule, not with the FAR, because the Schedule is where the binding numbers live. FAR 52.228-5(a) obligates the contractor to provide and maintain the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract, which means the regulation itself points away from the regulation and toward the contract document.

  1. Read the Schedule and the special contract requirements first. The FAR 28.307-2 amounts are what applies when the contract is silent. Contracts are rarely silent, and construction solicitations routinely carry limits well above the floor.
  2. Confirm which insurance clauses are actually incorporated. Check for FAR 52.228-5, for FAR 52.228-3 if any work falls under the Defense Base Act, and note whether the contract is fixed-price or cost-reimbursement, because that changes which clause set applies.
  3. Check the awarding agency’s supplement for an overlay. For GSA that means GSAR 552.228-5 and the additional insured and waiver of subrogation endorsements. For Army, Navy and DOE it means identifying who holds an approval right over your insurance program.
  4. Compare the required limits against what you and your subcontractors actually carry. Compare endorsement status, not just certificate expiration dates. An expired endorsement and an expired policy fail the same way when the contracting officer asks.
  5. Insert the substance of the clause into every affected subcontract, including the flow-down paragraph. FAR 52.228-5(c) requires the substance of the clause including paragraph (c) itself, which is what carries the obligation down through lower tiers.
  6. Collect proof before work starts and keep tracking it after. The obligation is continuous. Maintain a copy of every subcontractor’s proof of required insurance, keep it retrievable, and monitor for lapse and cancellation across the full period of performance.

For how this gets tracked across a subcontractor base rather than handled one certificate at a time, see COI tracking software for general contractors→ and subcontractor compliance automation→.

What does this page not cover?

This page covers federal agency insurance requirements for construction. It does not cover commercial or private construction insurance requirements, which are set by contract between private parties, vary by trade and project size, and are typically far higher than the federal floors. Nothing here should be applied to a private owner’s contract.

Several other boundaries are worth stating plainly.

The solicitation always controls. Every agency finding on this page describes what a published acquisition regulation says. It does not describe what your contract says. Where a solicitation, a Schedule, or a special contract requirement states an insurance limit or an endorsement requirement, that document governs and this page does not. For three of the five agencies covered here, the supplement sets no dollar limits at all, so the solicitation is the only source.

Agency supplements change more often than the FAR does. The FAR 28.307-2 amounts have been stable for a long time. The supplements are amended on their own schedules. As of July 29, 2026 the versions reviewed were GSAR 552.228-5 (JAN 2016, as amended at 81 FR 1533), VAAR 852.228-71 (MAR 2018, as amended at 84 FR 46455), DEAR 970.5228-1 (JUL 2013, with the prescription at 970.2803-2 amended at 89 FR 89787, November 13, 2024), NMCARS Change 18-22 effective July 11, 2022, and AFARS as revised October 1, 2024. Re-verify against the current text before relying on any of them.

AFARS and NMCARS are not published in the Code of Federal Regulations the way the FAR, GSAR, VAAR and DEAR are. They are component supplements hosted by their agencies and mirrored on acquisition.gov, and the acquisition.gov copy of AFARS currently carries a notice pointing to the Army’s own knowledge management portal as the official source. Treat the Army and Navy rows as directional and confirm against the agency’s own posting.

This page does not cover bonding. Miller Act payment and performance bonds are a separate statutory requirement under 40 U.S.C. 3131 to 3134 and are not insurance, even though the two get bundled together in Part 28 of the FAR and in most people’s mental model.

This is not legal or insurance advice. Coverage questions turn on policy language, endorsement forms, and state law, and none of that is resolvable from a regulation citation. Confirm requirements with your contracting officer and your broker, and involve counsel where a coverage position carries real exposure.

How does Contracts Connected help a federal GC keep insurance compliant?

The hard part of FAR 52.228-5(c) was never understanding it. It was producing every subcontractor’s proof of required insurance, complete and current, on the day the contracting officer asks, across a sub base that changes shape all year. Contracts Connected reads certificates and endorsements as they arrive, checks the coverage and limits against what that specific contract requires rather than against a generic template, flags what is missing or expiring, and keeps every document tied to the contract and the requirement it satisfies.

That means the answer to “produce proof of insurance for every subcontractor on this project” starts as a search rather than a reconstruction project. Our co-founder ran a large federal general contracting firm for 15 years, about 100,000 documents a year.

For the broader compliance picture on federal work, see construction compliance software for federal GCs→ and document management software for federal contractors→.

Frequently asked questions

What insurance does a federal construction contract require?

At minimum, the amounts set at FAR 28.307-2: employer’s liability coverage of at least $100,000, general liability bodily injury coverage of at least $500,000 per occurrence, and automobile liability of at least $200,000 per person, $500,000 per occurrence, and $20,000 per occurrence for property damage. Those are floors, not targets. FAR 28.306 states plainly that the contracting officer may require additional coverage and higher limits, and most construction solicitations do exactly that.

When does FAR 52.228-5 apply to a construction contract?

FAR 28.310 directs the contracting officer to insert FAR 52.228-5 when the contract is fixed-price, is expected to exceed the simplified acquisition threshold, and will require work on a Government installation. Two exceptions apply: when only a small amount of work happens on the installation, and when all installation work is performed outside the United States and its outlying areas. The simplified acquisition threshold is currently $350,000 under FAR 2.101.

Does a prime contractor have to collect proof of insurance from subcontractors?

Yes. FAR 52.228-5(c) requires the prime to insert the substance of the clause into subcontracts that require work on a Government installation, to require those subcontractors to provide and maintain the insurance specified in the contract, and to maintain a copy of all subcontractors’ proofs of required insurance. Those copies must be made available to the contracting officer on request, so the file has to be retrievable, not merely retained.

Which agency adds the most to the FAR insurance baseline for construction?

Among the five reviewed here, GSA adds the clearest written requirement. GSAR 528.310 directs contracting officers to insert GSAR 552.228-5, Government as Additional Insured, which requires every policy other than workers’ compensation to name the United States as an additional insured and requires the carrier to waive all subrogation rights against any named insured. The Army, Navy, VA, and DOE supplements add approval and process requirements rather than endorsement requirements.

Do USACE and NAVFAC publish their own construction insurance dollar minimums?

Not in their acquisition supplements. AFARS Subpart 5128.3 and NMCARS Subpart 5228.3 address policy, approvals, overseas coverage, and cost-reimbursement matters, and neither sets construction insurance dollar limits. DFARS Part 236, which covers construction contracting for the Department of Defense, contains no insurance provisions at all. For a USACE or NAVFAC project the operative limits come from the individual solicitation.

Do the FAR insurance minimums apply to private construction work?

No. FAR Subpart 28.3 and FAR 52.228-5 govern federal contracts. Private owners, developers, and general contractors set their own insurance requirements by contract, and those requirements are usually far higher than the federal floors and vary by trade and project size. A subcontractor working both federal and private jobs is normally carrying limits driven by the private requirements rather than by the FAR minimums.