Additional-insured endorsement verification checklist

The 11-point verification of a sub's additional-insured endorsement. Form, edition, completed ops, primary noncontributory, waiver of subrogation.

ExcelWordPDF

The 11 things every prime, GC, and federal contractor must confirm on a sub’s additional-insured endorsement. Before the certificate is filed.

Why this checklist exists

The certificate of insurance is not the coverage. You already know that. What you may not have documented is the systematic review process that catches the gap between what the ACORD 25 says and what the endorsement actually delivers.

Here’s the scenario that plays out on job sites across federal and commercial construction every week: your subcontract requires the sub to name you as additional insured on their GL policy, on a primary and noncontributory basis, with a waiver of subrogation. Your insurance reviewer looks at the ACORD 25, sees “Additional Insured per form CG 2010 and CG 2037” in the description of operations box, and marks the COI compliant. Six months later, the sub’s employee is injured on site. The claim comes in. Your insurance carrier pulls the endorsement form, the actual CG 2010 that’s attached to the sub’s policy, and finds out it’s the 2004 edition, not the 2013 edition. The 2004 edition doesn’t include the CG 2037 coverage for completed operations. Your additional-insured status covers ongoing operations only. The completed-operations gap is yours.

That is a real scenario. It happens because COI reviewers verify endorsement form numbers. They don’t always verify endorsement form editions, endorsement language, and the specific conditions that activate or limit additional-insured coverage. The ACORD 25 description of operations box is what the sub’s broker typed. The endorsement form attached to the policy is the actual contract term. Those two things need to match.

The gap between “additional insured noted on certificate” and “additional insured coverage that holds at claim time” comes from six consistent failure points: wrong endorsement form, wrong form edition, missing completed-operations coverage, missing primary-and-noncontributory language or endorsement, missing waiver of subrogation, and additional-insured status that’s conditional on the sub’s own negligence rather than being blanket. This checklist covers all of them.

Construction firms that work through this checklist on every subcontractor COI collect fewer surprises at claim time. The ones that accept the certificate face value find out the hard way. When the claim is in and the coverage isn’t there.

Who uses this checklist

  • Federal general contractors managing subcontractor insurance on projects where owner contracts pass through additional-insured requirements
  • Mid-market GCs with active subcontractor rosters where COI review happens in-house
  • Prime contractors whose subcontracts require primary-and-noncontributory additional-insured status from subs
  • Project managers and construction administrators responsible for collecting and verifying sub insurance before mobilization
  • Risk managers auditing subcontractor COI compliance across a multi-project portfolio

What’s included

The checklist covers 11 things every additional-insured endorsement verification must confirm:

  1. The actual endorsement form is in hand, not just the certificate reference. The ACORD 25 description of operations can reference any endorsement form the broker wants to type. The endorsement form attached to the policy is the binding document. Request the actual endorsement, ISO CG 20 10, CG 20 37, or the insurer’s proprietary equivalent, not just the certificate. If your contract requires a specific endorsement form, compare the language in the actual form to your contract requirement. “CG 2010” on the certificate without the actual form attached to the policy is not verification.
  2. Form edition is the correct version for your coverage requirement. Endorsement forms go through editions. CG 20 10 has meaningful differences across the 1985, 1993, 2001, 2004, and 2013 editions. Specifically around the scope of additional-insured coverage and the treatment of completed operations. Many contracts specify “CG 20 10 and CG 20 37, 2013 edition or equivalent” for a reason. If the sub’s policy has the 2004 edition, you may be missing completed-operations coverage entirely. Verify the edition year on every form, not just the form number.
  3. Completed-operations coverage is included and specifically endorsed. Ongoing-operations additional-insured coverage (CG 20 10) covers the sub’s operations while they’re working. Completed-operations coverage (CG 20 37) covers claims that arise after the work is done. The most common source of construction defect and injury claims. Your subcontract almost certainly requires both. A COI that references only CG 20 10 without CG 20 37, or an endorsement that limits additional-insured status to ongoing operations, leaves you exposed on every claim that materializes after project completion.
  4. Primary and noncontributory language is in the endorsement, not just on the certificate. “Primary and noncontributory” in the ACORD 25 description box is your broker’s representation of the policy. The actual coverage is in the endorsement. Either a primary-and-noncontributory endorsement attached to the policy, or specific language in the additional-insured endorsement itself. The endorsement must say that the sub’s GL is primary and will not seek contribution from your GL on covered claims. Without this, your carrier and the sub’s carrier argue about contribution while the claim sits unresolved.
  5. Waiver of subrogation is endorsed, not just noted on the certificate. Subrogation is the right of the sub’s insurer to pursue your insurance after paying a claim on your behalf. A waiver of subrogation is your requirement that the sub’s insurer give up that right for claims arising from the sub’s work on your project. Like primary-and-noncontributory, this needs to be an endorsement on the policy, specifically a Waiver of Transfer of Rights of Recovery (CG 24 04 or equivalent), not just a representation in the ACORD 25 remarks box. Verify the waiver endorsement is attached, not just referenced.
  6. Named insured on the endorsement matches the subcontract entity exactly. The sub’s policy is issued to a specific legal entity. The additional-insured endorsement flows from that same policy. Your subcontract is with a specific legal entity. All three need to match. The policy named insured, the endorsement, and your subcontract. A sub who operates as “Smith Mechanical LLC” but whose policy is issued to “Smith Mechanical Services Inc.” may have an endorsement that doesn’t apply to claims arising from the subcontract entity. Entity mismatches are a claim-time coverage dispute.
  7. Your entity is correctly named as additional insured. Your legal entity name, and any other entities your contract requires be named (project owner, lender, parent entity), must appear on the additional-insured endorsement or in the endorsement’s blanket additional-insured language. “Blanket additional insured” endorsements cover any entity required by written contract to be additional insured, without naming them specifically. Confirm your contract language triggers this. Scheduled endorsements name you specifically. Verify your name is correct and complete.
  8. Policy period covers the full project duration, including completed operations tail. The additional-insured endorsement is only effective during the policy period. If the sub’s policy expires mid-project and isn’t renewed, your additional-insured status expires with it. Verify the policy expiration date against the project schedule and require 30-day advance notice of cancellation (noted on the ACORD 25 and endorsed on the policy). For completed-operations coverage, confirm the tail period. Some policies require the completed-operations endorsement to survive beyond the policy year in which the work was completed.
  9. Endorsement does not limit additional-insured status to sub’s own negligence. Some endorsements contain language that limits additional-insured status to claims arising solely from the named insured’s (sub’s) acts or omissions. This is a restricted form of additional-insured status that may not satisfy your subcontract requirement. If you’re partially negligent in a covered incident, the endorsement may not protect you. Compare the endorsement language to your subcontract requirement: “arising out of” the sub’s operations is broader than “caused by” the sub’s negligence.
  10. Project-specific endorsement is used when required by contract. Some owner contracts, particularly on federal and large commercial projects, require project-specific additional-insured endorsements rather than blanket endorsements, because they tie the coverage to the specific project and may include project-specific conditions. If your prime contract specifies a project-specific endorsement, verify that’s what the sub is providing. Blanket endorsements are generally acceptable in most commercial settings; project-specific endorsements provide tighter coverage documentation for the specific contract.
  11. Certificate holder and notice of cancellation are correctly specified. The ACORD 25 must name you as certificate holder. The entity to whom notice of cancellation is sent. Verify the certificate holder matches the entity specified in your subcontract’s insurance requirements. The 30-day (or 10-day for non-payment) advance notice of cancellation must be noted. Some jurisdictions or owner contracts require the cancellation notice provision be endorsed on the policy, not just represented on the ACORD 25. Confirm the requirement and how the sub has addressed it.

How to use this checklist

Run this checklist for every subcontractor COI that includes an additional-insured requirement in the subcontract. Don’t run it after the sub has mobilized. Run it before you countersign the subcontract or issue the notice to proceed. If the endorsement isn’t available at COI submission, require it as a pre-mobilization condition and hold NTP until it arrives.

For each item, mark OK, Deficient, or Pending. Any deficiency before mobilization is a subcontract compliance issue. The sub needs to resolve it with their broker, not you. Keep the completed checklist with the COI in the project file. If a claim arises on this project, the file documentation of what you reviewed and when is your evidence of appropriate risk management.

Stop accepting certificates without verifying the endorsement

The coverage that matters at claim time is in the endorsement, not the certificate. A COI review process that stops at the ACORD 25 is leaving the most important part of the check undone. Contracts Connected’s COI Analyzer reads the actual endorsement details, form number, edition, primary-and-noncontributory language, waiver of subrogation, and flags gaps before the sub mobilizes, not after the claim arrives.

For educational purposes. These templates, checklists, and trackers are operator-built starting points designed to help you move faster on the kind of work that usually drowns construction admins in email chains. They are not legal, insurance, accounting, or tax advice. Each project, jurisdiction, and contract has its own quirks. Review the document, refine the language, and consult your attorney, broker, CPA, or compliance officer before relying on it for a live project decision.

Frequently asked questions about the additional-insured endorsement verification checklist

What is an additional-insured endorsement and why is it not enough to just have “additional insured” on the certificate?

An additional-insured endorsement is the actual policy modification that grants another party insured status under a liability policy. The ACORD 25 certificate is a summary document. It represents what the broker says the policy provides, but it’s not the policy and it’s not binding on the insurer. In a coverage dispute, the insurer is bound by the policy language, not the certificate. This is why the actual endorsement, the form number, edition, and attached text, matters more than what the ACORD 25 says. A certificate that says “additional insured” without the endorsement backing it up is a representation without coverage.

What is the difference between CG 20 10 and CG 20 37?

Both are ISO (Insurance Services Office) additional-insured endorsement forms. CG 20 10 covers liability arising from the named insured’s ongoing operations. The work the sub is actively performing. CG 20 37 covers liability arising from the named insured’s completed operations. Claims that arise after the work is finished. Most construction subcontracts require both forms because completed operations claims (construction defects, post-completion injuries, latent defects) are common and often arise years after project completion. Getting only CG 20 10 without CG 20 37 is a gap that doesn’t become visible until a completed-operations claim arrives.

What does “primary and noncontributory” mean and why does it matter?

“Primary” means the sub’s GL pays first, before your GL is triggered on a covered claim. “Noncontributory” means the sub’s GL won’t seek contribution from your GL, even if you’re also insured for the same loss. Without primary-and-noncontributory status, your carrier and the sub’s carrier share the claim burden, which means slower resolution, potential contribution disputes, and potential impact on your own claims history. Most subcontracts require primary-and-noncontributory status for exactly this reason. The language must be in the endorsement, not just on the certificate.

What is a waiver of subrogation and why is it separate from additional-insured status?

Subrogation is the right an insurer acquires to pursue another party’s insurance after paying a claim. If the sub’s insurer pays a claim arising from the sub’s work, the insurer can then pursue your insurance for contribution. That’s subrogation. A waiver of subrogation is the sub’s insurer agreeing to give up that right. It’s separate from additional-insured status because it addresses a different coverage mechanism: additional-insured status covers you for claims, waiver of subrogation prevents recovery actions against you after a covered claim is paid. Both are typically required in construction subcontracts. Both need to be endorsed on the policy.

How do I request the actual endorsement form, not just the certificate?

Ask the sub’s broker directly. The broker maintains the policy endorsements and can provide copies. Request the specific endorsement forms referenced in the ACORD 25 description of operations: “please provide the actual CG 20 10 and CG 20 37 endorsements attached to the policy, showing the form edition year and the listed additional insureds.” Brokers can provide this within 24-48 hours for an active policy. If a sub or broker pushes back on providing the endorsement forms, treat that as a compliance risk flag.

What should I do if the endorsement has a deficiency. Wrong edition, missing completed ops, or limited language?

Return the COI to the sub with a written deficiency notice specifying exactly what’s required and a deadline for correction. Do not proceed to NTP with a deficient endorsement. The fix requires the sub’s broker to amend the policy endorsement and reissue the certificate. A process that typically takes 2-5 business days for a routine amendment. If the sub’s policy won’t support the required endorsement (because the policy itself is limited), the sub may need to work with their carrier to upgrade coverage, which takes longer. Start the verification process early enough that a round-trip correction doesn’t delay mobilization.

Where this document lives in the system
Back-Office System · Contracts Connected
Product bridge

Contracts Connected reads every certificate and endorsement a vendor sends back against your requirements, flags what is missing or expired, and clears the vendor to mobilize. COI tracking.

More in ACORD 25 / COI

All ACORD 25 / COI templates