Paperwork and rework data

Construction Paperwork and Rework Statistics

In a 2018 PlanGrid and FMI survey, construction leaders estimated they spent 14.1 hours a week on non-optimal work: 5.5 hours looking for project data, 4.7 on conflict resolution and 3.9 on mistakes and rework. In AGC and Sage's survey for 2025, 40% of firms said they expect to spend more on document management software.

This page lists sourced figures on time lost to poor data and rework, software plans, signature delays and hiring for office roles. Each figure shows its publisher, year, sample and limit. Contracts Connected compiled and checked these figures. They are third-party figures, not Contracts Connected customer data.

Most figures are self-reported survey estimates, and some come from companies that sell software. The claim checks show that the $1.85 trillion figure is global and for 2020, and that the 35% figure is not an administrative-time figure.

Last reviewed: November 2026. 17 reviewed figures. 2 claim checks. Compilation licensed under CC BY 4.0.

Section A 5 figures

How much time and money poor data and rework cost

A 2018 PlanGrid and FMI survey. The hours are self-estimates, and the dollar figures are modeled from them.

14.1 hours a week

Hours a week construction leaders spent on non-optimal work, 2018

In a 2018 survey of 599 construction leaders, people estimated they spent 14.1 hours a week on non-optimal work: 5.5 hours looking for project data, 4.7 on conflict resolution and 3.9 on mistakes and rework.

The limit. Self-estimated hours from a 2018 survey sponsored by a software vendor.

Year
2018
Sample and method
Survey of 599 construction leaders in April 2018: 500 in the US, 99 in Australia, New Zealand, the UK and Canada; self-estimated hours; sponsored by PlanGrid, a software vendor later bought by Autodesk
US or not
Not US only (500 of 599 respondents in the US)
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Hours a week construction leaders spent on non-optimal work, 2018," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#plangrid-fmi-2018-hours-a-week-on-non-optimal-work. Original source: PlanGrid and FMI, Construction Disconnected: The High Cost of Poor Data and Miscommunication, 2018. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
35%

Share of work hours spent on non-optimal activities, 2018

The PlanGrid and FMI study found construction teams spent an average of 35% of their work hours on non-optimal activities each week: 13.4% looking for project data, 11.6% on conflict resolution and 9.6% on mistakes and rework.

The limit. Self-estimated, 2018, global sample with a US majority. 'Non-optimal' is the study's own label and is not limited to office work.

Year
2018
Sample and method
Survey of 599 construction leaders in April 2018: 500 in the US, 99 in Australia, New Zealand, the UK and Canada; self-estimated hours; sponsored by PlanGrid, a software vendor later bought by Autodesk
US or not
Not US only (500 of 599 respondents in the US)
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Share of work hours spent on non-optimal activities, 2018," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#plangrid-fmi-2018-35-percent-of-work-hours-non-optimal. Original source: PlanGrid and FMI, Construction Disconnected: The High Cost of Poor Data and Miscommunication, 2018. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
5.5 hours a week

Hours a week spent looking for project data, 2018

Respondents in the 2018 PlanGrid and FMI survey estimated they spent 5.5 hours a week looking for project data, about 13.4% of their time.

The limit. Self-estimated by construction leaders; not a time study.

Year
2018
Sample and method
Survey of 599 construction leaders in April 2018: 500 in the US, 99 in Australia, New Zealand, the UK and Canada; self-estimated hours; sponsored by PlanGrid, a software vendor later bought by Autodesk
US or not
Not US only (500 of 599 respondents in the US)
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Hours a week spent looking for project data, 2018," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#plangrid-fmi-2018-hours-a-week-looking-for-project-data. Original source: PlanGrid and FMI, Construction Disconnected: The High Cost of Poor Data and Miscommunication, 2018. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
$177.5 billion

Estimated US labor cost of non-optimal activities, 2018

PlanGrid and FMI estimated that time spent on non-optimal activities would cost US construction $177.5 billion in labor in 2018.

The limit. A modeled estimate built on self-reported hours and 2018 labor costs.

Year
2018
Sample and method
Survey of 599 construction leaders in April 2018: 500 in the US, 99 in Australia, New Zealand, the UK and Canada; self-estimated hours; sponsored by PlanGrid, a software vendor later bought by Autodesk
US or not
Not US only (500 of 599 respondents in the US)
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Estimated US labor cost of non-optimal activities, 2018," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#plangrid-fmi-2018-non-optimal-activities-cost-us-labor. Original source: PlanGrid and FMI, Construction Disconnected: The High Cost of Poor Data and Miscommunication, 2018. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
52%

Share of rework caused by poor data and miscommunication, 2018

PlanGrid and FMI reported that 52% of rework globally was caused by poor data and miscommunication. For the US they estimated $31.3 billion of about $65 billion in rework spending in 2018.

The limit. Survey-based estimate from 2018.

Year
2018
Sample and method
Survey of 599 construction leaders in April 2018: 500 in the US, 99 in Australia, New Zealand, the UK and Canada; self-estimated hours; sponsored by PlanGrid, a software vendor later bought by Autodesk
US or not
Not US only (500 of 599 respondents in the US)
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Share of rework caused by poor data and miscommunication, 2018," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#plangrid-fmi-2018-rework-caused-by-poor-data. Original source: PlanGrid and FMI, Construction Disconnected: The High Cost of Poor Data and Miscommunication, 2018. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
Section B 4 figures

How much bad data costs, globally and across industries

Estimates from a 2021 Autodesk and FMI survey and a 2012 McKinsey estimate. None of them is a US construction figure.

14%

Rework cost of decisions made on bad data, 2020

Autodesk and FMI estimated that decisions made on bad data cost the industry $88.69 billion in rework, 14% of all rework performed in 2020.

The limit. Global estimate from a vendor-sponsored survey. 'Bad data' is the study's own definition.

Year
2021
Sample and method
Survey of over 3,900 construction professionals worldwide about their 2020 data practices; Autodesk is a software vendor
US or not
Global
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Rework cost of decisions made on bad data, 2020," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#autodesk-fmi-2021-bad-data-rework-share. Original source: Autodesk and FMI, Harnessing the Data Advantage in Construction (press release, September 14, 2021), 2021. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
30%

Respondents who say more than half their project data is bad

In the Autodesk and FMI survey, 30% of respondents said more than half of their project data is 'bad' and leads to poor decisions more than 50 percent of the time.

The limit. Respondent opinion, global, vendor-sponsored.

Year
2021
Sample and method
Survey of over 3,900 construction professionals worldwide about their 2020 data practices; Autodesk is a software vendor
US or not
Global
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Respondents who say more than half their project data is bad," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#autodesk-fmi-2021-project-data-bad-more-than-half. Original source: Autodesk and FMI, Harnessing the Data Advantage in Construction (press release, September 14, 2021), 2021. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
$1.85 trillion

Estimated global cost of bad data, 2020

Autodesk and FMI estimated that bad data may have cost the global construction industry $1.85 trillion in 2020.

The limit. Global, modeled, and not a US figure. See the claim check below.

Year
2021
Sample and method
Survey of over 3,900 construction professionals worldwide about their 2020 data practices; Autodesk is a software vendor
US or not
Global
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Estimated global cost of bad data, 2020," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#autodesk-fmi-2021-bad-data-global-cost-1-85-trillion. Original source: Autodesk and FMI, Harnessing the Data Advantage in Construction (press release, September 14, 2021), 2021. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
Nearly 20 percent

Time interaction workers spend looking for information, all industries

McKinsey Global Institute estimated in 2012 that the average interaction worker spends about 28 percent of the workweek on e-mail and nearly 20 percent looking for internal information or tracking down colleagues.

The limit. Knowledge workers across industries, not construction, and a 2012 estimate.

Year
2012
Sample and method
Modeled estimate from MGI research across industries
US or not
Global, all industries
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Time interaction workers spend looking for information, all industries," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#mckinsey-2012-time-spent-looking-for-internal-information. Original source: McKinsey Global Institute, The social economy: Unlocking value and productivity through social technologies, 2012. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
Section C 2 figures

What firms plan to buy and what slows them down

AGC and Sage survey results for 2025. These are plans and challenges that firms listed.

40%

Firms that expect to spend more on document management software

In AGC and Sage's survey for 2025, 40% of firms said they expect to spend more on document management software.

The limit. Stated plans, not spending. Sage sells construction software.

Year
2025
Sample and method
Survey of AGC members, November to December 13, 2024; 1,109 firms from 48 states and DC; Sage sells construction software
US or not
US
Status
Reviewed
Reviewed
November 2026

Cite as: Contracts Connected, "Firms that expect to spend more on document management software," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#agc-sage-2025-plan-to-spend-more-on-document-management-software. Original source: AGC of America and Sage, 2025 Construction Hiring and Business Outlook Report, 2025. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
39%

Biggest IT challenges firms list

In AGC and Sage's survey for 2025, 39% of firms listed finding the time to implement and train on new technology as one of their biggest IT challenges. Another 36% listed employee resistance, 32% field-to-office communication and 28% integration between software.

The limit. Respondents could pick several challenges. Members of AGC only.

Year
2025
Sample and method
Survey of AGC members, November to December 13, 2024; 1,109 firms from 48 states and DC; Sage sells construction software
US or not
US
Status
Reviewed
Reviewed
November 2026

Cite as: Contracts Connected, "Biggest IT challenges firms list," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#agc-sage-2025-biggest-it-challenges. Original source: AGC of America and Sage, 2025 Construction Hiring and Business Outlook Report, 2025. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
Section D 4 figures

Which documents take longest to sign, and how many firms still use paper

Surveys from 2019 and 2025. Both come from companies that sell signing or paper-replacing software.

69.5%

Respondents who say change orders take longest to get signed, 2019

In a JBKnowledge survey published by DocuSign in 2019, 69.5% of respondents said change orders take the longest to get signed during the construction process.

The limit. 2019, over 300 respondents, vendor-published, and it measures where delay sits, not how long it lasts.

Year
2019 (file dated January 2019)
Sample and method
Survey of over 300 construction professionals, run by JBKnowledge and published by DocuSign, an e-signature vendor; question wording not published
US or not
Not stated
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Respondents who say change orders take longest to get signed, 2019," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#docusign-jbknowledge-2019-change-orders-take-longest-to-sign. Original source: DocuSign (survey by JBKnowledge), How the construction industry uses electronic signatures (infographic), 2019 (file dated January 2019). Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
54.4%

Document that takes longest to get signed during bidding, 2019

In the same 2019 JBKnowledge survey, 54.4% picked 'Subcontractor Agreements' as the document that takes longest to get signed during bidding and estimating.

The limit. 2019, over 300 respondents, vendor-published. The quoted label is the survey's own wording.

Year
2019 (file dated January 2019)
Sample and method
Survey of over 300 construction professionals, run by JBKnowledge and published by DocuSign, an e-signature vendor; question wording not published
US or not
Not stated
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Document that takes longest to get signed during bidding, 2019," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#docusign-jbknowledge-2019-bidding-documents-take-longest-to-sign. Original source: DocuSign (survey by JBKnowledge), How the construction industry uses electronic signatures (infographic), 2019 (file dated January 2019). Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
42%

Respondents using or considering electronic signatures, 2019

In the 2019 JBKnowledge survey published by DocuSign, 42% of respondents already used an electronic signature solution, 38% were considering one and 20% were not interested.

The limit. A 2019 survey of over 300 construction professionals, published by a company that sells e-signature software.

Year
2019 (file dated January 2019)
Sample and method
Survey of over 300 construction professionals, run by JBKnowledge and published by DocuSign, an e-signature vendor; question wording not published
US or not
Not stated
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Respondents using or considering electronic signatures, 2019," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#docusign-jbknowledge-2019-electronic-signature-use. Original source: DocuSign (survey by JBKnowledge), How the construction industry uses electronic signatures (infographic), 2019 (file dated January 2019). Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
43%

Firms that still rely on physical signatures and approvals

In Bluebeam's 2026 outlook survey, 43% of architecture, engineering and construction firms said they still rely on physical signatures and approvals.

The limit. Five countries, technology decision-makers, and Bluebeam sells software that replaces paper.

Year
2025
Sample and method
Online survey of over 1,000 technology decision-makers at architecture, engineering and construction firms in the US, UK, France, Germany and Australia, July 2025; Bluebeam is a software vendor
US or not
Five countries (US, UK, France, Germany, Australia)
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Firms that still rely on physical signatures and approvals," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#bluebeam-2026-firms-relying-on-physical-signatures. Original source: Bluebeam, Building the Future: Bluebeam AEC Technology Outlook 2026 (press release, October 2025), 2025. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
Section E 2 figures

How hard it is to hire for office-side roles

AGC's 2025 workforce survey. It did not ask about contract administrators or other back-office roles.

84%

Firms with salaried openings that are as hard or harder to fill

AGC found that four-fifths of firms had openings for salaried workers. Of those, 84% said the roles were as hard or harder to fill than a year earlier.

The limit. Salaried roles in general, not contract administration or back-office roles specifically.

Year
2025
Sample and method
Survey of AGC members, July and August 2025; 1,342 individuals; 57% of firms at $50 million or less in annual work
US or not
US
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Firms with salaried openings that are as hard or harder to fill," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#agc-nccer-2025-hard-to-fill-salaried-roles. Original source: AGC of America and NCCER, 2025 Workforce Survey Analysis, 2025. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
77%

Firms that say estimating roles are hard to fill

In AGC's 2025 workforce survey, 77% of firms looking for estimating staff said the roles are hard to fill. Project managers and supervisors followed at 76%.

The limit. Estimators and project managers are office-side roles, but the survey did not ask about contract administrators or other back-office roles.

Year
2025
Sample and method
Survey of AGC members, July and August 2025; 1,342 individuals; 57% of firms at $50 million or less in annual work
US or not
US
Status
Reviewed, with limits
Reviewed
November 2026

Cite as: Contracts Connected, "Firms that say estimating roles are hard to fill," Contracts Connected Data, https://contractsconnected.com/data/construction-paperwork-statistics#agc-nccer-2025-hard-to-fill-estimating-roles. Original source: AGC of America and NCCER, 2025 Workforce Survey Analysis, 2025. Reviewed November 2026. Compilation licensed under CC BY 4.0.

Change log
  • 2026-11-03. Added. Checked against the original source.
Section F 2 checks

Claim checks: two figures quoted without their limits

These two figures are often quoted without their year, region or definition. For each one, we show what the original source measured.

$1.85 trillion

Claim check: "Bad data cost the US construction industry $1.85 trillion"

The claim as repeated. Bad data cost the US construction industry $1.85 trillion

Where it came from. Often repeated as a US or industry-wide figure without a year. The source is Autodesk and FMI, 'Harnessing the Data Advantage in Construction' (September 14, 2021), which says bad data 'may have cost the global construction industry $1.85 trillion in 2020'.

What it shows. A global estimate for 2020 from a survey of over 3,900 professionals.

What it does not show. It is not a US figure. It was built by two organizations that sell or advise on data tools. The US-specific 2018 estimate on this page comes from a different study.

Verdict. The estimate is global and for 2020. It cannot be cited as a US figure or as a figure without a year.

Safe wording. "Autodesk and FMI estimated that bad data may have cost the global construction industry $1.85 trillion in 2020."

Do not cite this as a measured finding.

Year
2021
Status
Claim check: not cited as a finding
Reviewed
November 2026
Change log
  • 2026-11-03. Added. Checked against the original source.
35%

Claim check: "Construction teams spend 35% of their time on non-productive work"

The claim as repeated. Construction teams spend 35% of their time on non-productive work

Where it came from. Common in vendor blogs, often with 'wasted' or 'admin' added. The source is PlanGrid and FMI, Construction Disconnected (2018). The PDF says teams spend 'an average of 35% of their work hours on non-optimal activities', which it defines as looking for data, conflict resolution and mistakes and rework.

What it shows. A self-estimate from 599 leaders.

What it does not show. It is not an administrative-time figure. It covers looking for data, conflict resolution, and mistakes and rework.

Verdict. The 35% is real but narrower than the claim. It is a self-estimate of non-optimal activities, not of administrative time.

Safe wording. "PlanGrid and FMI found that 599 leaders estimated an average of 35% of their work hours went to non-optimal activities: looking for data, conflict resolution, and mistakes and rework."

Do not cite this as a measured finding.

Year
2018
Status
Claim check: not cited as a finding
Reviewed
November 2026
Change log
  • 2026-11-03. Added. Checked against the original source.
Method

How we check figures

  1. Find the original publisher. We trace each figure to the organization that first published it, not to a page that repeats it.
  2. Fetch the page. We open the original page or file and read the figure there.
  3. Read the sample and method. We note who was counted, how, and when.
  4. State the limit. We write what the figure does not show, next to the figure.

Every figure on this page was re-read at its original source on 2026-11-03. The date of each check sits in the card's change log.

Questions

Frequently asked questions

How much time do construction teams lose to poor data and rework?

People in a 2018 PlanGrid and FMI survey estimated they spent 14.1 hours a week on non-optimal work, including 5.5 hours looking for project data and 3.9 on mistakes and rework.

Do construction teams spend 35% of their time on admin?

No. The 35% is PlanGrid and FMI's figure for non-optimal activities, self-estimated by 599 leaders. It covers looking for data, conflict resolution, and mistakes and rework, so it is not an administrative-time figure.

Did bad data cost the US construction industry $1.85 trillion?

No. Autodesk and FMI estimated that bad data may have cost the global construction industry $1.85 trillion in 2020. It is a global estimate for one year, not a US figure.

How much rework comes from poor data?

PlanGrid and FMI reported that 52% of rework globally was caused by poor data and miscommunication. For the US they estimated $31.3 billion of about $65 billion in rework spending in 2018.

Which documents take longest to get signed?

In a 2019 JBKnowledge survey published by DocuSign, 69.5% of respondents said change orders take the longest to get signed during construction. The survey had over 300 respondents and DocuSign sells e-signature software.

How many firms still use physical signatures?

In Bluebeam's 2026 outlook survey, 43% of architecture, engineering and construction firms said they still rely on physical signatures and approvals. The survey covered technology decision-makers in five countries.

Can I cite these figures?

Yes. You can quote, chart and republish them under CC BY 4.0 with credit to Contracts Connected. The numbers belong to the publishers, so cite the original source too. A link is welcome, never required.

Is this Contracts Connected customer data?

No. These are third-party figures that Contracts Connected compiled and checked against each original source. None of them is Contracts Connected customer data.

Cite our data

How to cite this page

You can quote, chart and republish any figure here. The Contracts Connected compilation (our wording, the notes and the layout) is licensed under Creative Commons Attribution 4.0 (CC BY 4.0). The numbers themselves belong to the organizations that published them, so cite the original source too.

Short credit. Source: Contracts Connected

Full credit. Contracts Connected, "Construction Paperwork and Rework Statistics," https://contractsconnected.com/data/construction-paperwork-statistics, reviewed November 2026, CC BY 4.0.

Linking. A link back is welcome and never required. If you link, any kind of link is fine, followed or not. Please use the name "Contracts Connected" or the page address as the link text.

Questions or corrections. support@contractsconnected.com. If a source changes a figure, we update it and record the change.

Downloads. CSV and JSON, with every figure and its change log.