Free SF-1413 Acknowledgment Template + Filing Checklist

The Statement and Acknowledgment form every federal-construction sub signs at award, plus the prime's 12-step filing checklist for FAR 52.222-11.

ExcelWordPDF

The Statement and Acknowledgment form every federal-construction subcontractor signs at award, plus the prime’s 12-step filing checklist that keeps the signed copy where DOL can find it three years later.

Why federal primes need an SF-1413 template and a filing checklist together

Every construction subcontract under a federal construction contract over $2,000 (FAR 22.407(a)) triggers SF-1413. FAR 52.222-11(d) is explicit: within 14 days after award, the prime delivers a completed Statement and Acknowledgment for each subcontract to the contracting officer. Keep a copy for three years after final payment (FAR 4.703). Skip any of those steps and the prime owns the consequences. Back wages, withheld payment, debarment, and on a 2025 Davis-Bacon investigation, False Claims Act exposure.

The form itself isn’t complicated. It’s one page. The sub’s authorized signer fills in the prime contract number, the subcontractor’s legal entity, the subcontract amount, and signs an acknowledgment that Davis-Bacon, Copeland Anti-Kickback, and the Contract Work Hours and Safety Standards Act flow down to them via the subcontract. Done in five minutes.

The problem isn’t filling out SF-1413. The problem is the filing cycle around it. The prime sends the form to a sub at award. The sub’s signer is on vacation. Two weeks pass. The sub returns the form with the wrong contract number filled in. The prime fixes it, returns it, the sub re-signs. Now four weeks have gone by, the project’s already in motion, and the prime hasn’t forwarded a single SF-1413 to the contracting officer. Six months later DOL opens an audit on a wage-decision question, asks for the SF-1413s, and the prime is missing acknowledgments for nine of its twelve subs.

That’s the wedge. DOL’s own SF-1413 form is the SERP-dominant authority on what the form is. Nobody, not Westlaw, not Wolters Kluwer, not eBacon, speaks to the operator workflow that surrounds it. When to send it. How to track its return. Who signs at the sub. What to do when the signer returns it half-completed. Where the signed copy lives in the prime’s contracts file. How to retrieve it three years post-completion when DOL wants it.

This is a hybrid template. It’s a guide to the SF-1413 form (the form itself is in GSA’s forms library), paired with the prime’s 12-step filing checklist. The form is the federal-mandated artifact. The checklist is the operator-built process that makes sure the artifact actually gets where it needs to go, on time, with the right signatures, retained for the right window.

Send SF-1413 to every sub within 7 days of subcontract award. Ask for it back within 7 days so you can deliver it to the contracting officer by day 14 (FAR 52.222-11(d)). Forward the signed copy to the contracting officer, retain a copy in the prime’s project contracts file alongside the executed subcontract, and keep it for three years after final payment (FAR 4.703). When DOL or the contracting agency’s labor compliance officer eventually asks, you hand them the binder and the audit moves on to the next sub. Without the binder, the audit becomes a back-wage discovery exercise, and the back wages flow to the prime, not the sub.

Who this template + filing checklist is for

  • Federal general contractors awarding construction subcontracts on Davis-Bacon projects
  • Prime contractors under FAR 52.222-11 acknowledgment-collection obligations
  • Contracts administrators running the federal subcontract award cycle
  • Compliance officers building the DOL-audit-ready evidence trail
  • Project administrators managing the contracts file across the 3-year retention window

If you’re the sub being asked to sign one of these, work through the Davis-Bacon audit prep checklist first to confirm your own posture before the prime starts sending you forms.

The 12 SF-1413 fields and filing steps

The template + checklist captures the 12 fields and filing steps every prime must work through for every sub on every federal-construction project:

  1. SF-1413 form identification. Title, OMB control number, current revision date. The form is officially “Statement and Acknowledgment,” OMB Control No. 9000-0066, current revision 10/2023. Get the current form from GSA’s forms library before sending.
  2. Prime contract number, agency name, and contracting officer identification. The prime fills in the federal contract number (typically a procurement-instrument identifier like W912DY-26-D-0001 for Army Corps, or 70S08125F0000XXX for DHS), the contracting agency name, and the assigned contracting officer’s name and contact info. Wrong contract number is the #1 reason a returned SF-1413 needs to be re-executed.
  3. Subcontractor legal entity name, EIN, UEI, and physical address. The sub’s full legal entity (LLC, Inc., partnership), not the DBA. Federal Employer Identification Number (9 digits) and Unique Entity Identifier (12-character SAM.gov ID) both required as of the 2022 SAM.gov / DUNS sunset. Address must match what’s on file in SAM.gov to avoid award-cycle hold-ups.
  4. Subcontract amount and scope description. Total subcontract dollar value plus a 1-2 sentence scope description. Match the scope language to what’s in the executed subcontract. Auditors cross-reference the SF-1413 scope against the actual subcontract document.
  5. Acknowledgment of Davis-Bacon flow-down clauses (FAR 22.406, 52.222-6 through 52.222-15). The sub acknowledges that the Davis-Bacon prevailing-wage obligations flow down via the subcontract. The form references FAR clauses 52.222-6 (Construction Wage Rate Requirements), 52.222-7 (Withholding of Funds), 52.222-8 (Payrolls and Basic Records), and so on through 52.222-15. The sub’s acknowledgment is what makes prime-to-sub flow-down enforceable.
  6. Acknowledgment of Copeland Anti-Kickback Act (40 USC §3145). The sub acknowledges the Copeland Act prohibition on kickback of any portion of wages from a federal-project worker. This is the federal anti-fraud backstop. DOL pursues Copeland violations criminally in egregious cases. Sub-signed acknowledgment puts the obligation directly on the sub’s authorized signer.
  7. Acknowledgment of Contract Work Hours and Safety Standards Act (CWHSSA, 40 USC §3702). The sub acknowledges CWHSSA. The federal overtime obligation for laborers and mechanics on federally-funded construction. CWHSSA requires 1.5x for any hour over 40 in a workweek, regardless of state law. Sub acknowledgment is what flows the obligation past the prime’s contractual reach.
  8. Authorized signer name, title, and signature date. Someone with authority to sign for the sub signs, and the form records their name and title (blocks 15a and 15b). Date it when it is signed, since the prime has 14 days after award to deliver it (FAR 52.222-11(d)).
  9. Filing routing. Sub returns signed SF-1413 to prime; prime forwards to contracting officer. Once signed, the sub returns the form to the prime (typically email + hardcopy original to follow). The prime reviews for completeness, fixes any errors with the sub if needed, and forwards the signed copy to the contracting officer per the contract’s submission instructions. Most contracts require email submission; some still require hardcopy.
  10. Submission deadline (14 days after award, FAR 52.222-11(d)). The 14-day window is a requirement. FAR 52.222-11(d) has the prime deliver a completed SF-1413 to the contracting officer within 14 days after the contract is awarded, and an updated one within 14 days of each subcontract awarded later. Late submissions can trigger contract-administration findings on the next audit.
  11. Retention requirement. 3 years post-project completion (FAR 4.703). FAR 4.703 sets the federal records-retention floor at 3 years after final payment under the prime contract. Some agencies (DOL Wage and Hour, specifically) extend this contractually. Best practice: retain SF-1413s for 7 years to cover any state UCC, state-tax, or insurance subrogation windows that may extend beyond the federal floor.
  12. Audit-trail filing location. SF-1413 lives in the prime’s project contracts file alongside the executed subcontract. The signed SF-1413 belongs in the same folder as the executed subcontract, the wage decision attached at award, the certified payrolls collected from the sub, and any modifications. When DOL or the contracting agency requests records, the package is one binder per sub, not three different cabinets. The filing checklist’s job is to make sure the binder is complete before the auditor arrives.

How to send SF-1413 and run the filing checklist on every sub

Send SF-1413 to every new federal-construction sub within 7 days of subcontract award. For each new sub:

  • Download the current SF-1413 from GSA’s forms library and fill in the prime contract number, agency, and contracting officer fields. Save 30 minutes per sub.
  • Email the form to the sub’s authorized signer with the executed subcontract. Ask for it back within 7 days.
  • When the signed form returns, verify completeness against the 12-point checklist. Wrong contract number and unauthorized-signer issues are the two most common defects. Fix and re-execute if needed.
  • Forward the signed SF-1413 to the contracting officer per the contract’s submission instructions. Save the transmission email and any acknowledgment of receipt.
  • File the signed SF-1413 in the project contracts file alongside the executed subcontract. Tag with sub name, signature date, and contract number for retrieval.
  • Audit the file quarterly using the working Excel checklist. Anything missing → assign owner and 14-day deadline.

Stop chasing SF-1413 acknowledgments from subs after award

Twelve subs on a federal project means twelve SF-1413s the prime has to send, track, retrieve, verify, and forward to the contracting officer. Within 14 days of award, every time. Multiply that by every federal project in your pipeline and you’ve built a job out of paperwork that nobody on your team wanted. In Contracts Connected, add SF-1413 to each vendor’s list of required documents and it goes out with the contract package. The vendor portal reminds vendors Monday and Wednesday mornings until everything is in, your team approves or rejects each document, and the Tracker shows every vendor and every required document.

For educational purposes. These templates, checklists, and trackers are operator-built starting points designed to help you move faster on the kind of work that usually drowns construction admins in email chains. They are not legal, insurance, accounting, or tax advice. Each project, jurisdiction, and contract has its own quirks. Review the document, refine the language, and consult your attorney, broker, CPA, or compliance officer before relying on it for a live project decision.

Frequently asked questions about SF-1413

When does SF-1413 need to be filed?

Under FAR 52.222-11(d), the prime delivers a completed SF-1413 to the contracting officer for each construction subcontract within 14 days after the prime contract is awarded, and an updated one within 14 days of each subcontract awarded after that. A copy stays in the prime’s contracts file for at least 3 years after final payment (FAR 4.703).

Who at the subcontractor signs SF-1413?

Someone with authority to sign for the subcontractor. The form records their name and title (blocks 15a and 15b) and acknowledges that the Davis-Bacon, Copeland Anti-Kickback, and CWHSSA clauses are written into the subcontract.

What happens if the sub never returns a signed SF-1413?

The prime has missed the FAR 52.222-11(d) deadline, and under FAR 52.222-11(c) it is still responsible for compliance by the sub with Davis-Bacon, Copeland, and CWHSSA. In practice, the prime carries the withheld-payment risk and, on willful patterns, debarment risk. Best practice: hold subcontract activation until the SF-1413 returns, or escalate to the sub’s senior leadership by day 7 if no response.

Is SF-1413 still required if my sub is union and pays union scale?

Yes. SF-1413 is a federal-form acknowledgment of Davis-Bacon flow-down, separate from the question of whether the sub’s wage rates meet the wage decision. Even subs paying above the wage decision via union agreements must sign SF-1413 acknowledging Davis-Bacon, Copeland, and CWHSSA apply. The form isn’t about the rate; it’s about the acknowledgment that the federal labor regime governs.

Do I need a new SF-1413 for every modification or change order?

Not for typical change orders within the original scope. A new SF-1413 is required when a separate subcontract is executed (new prime contract, new project, new agency), or when a change order materially expands the subcontract scope into a different statutory category (e.g., from material-supply-only to construction labor). When in doubt, execute a fresh SF-1413.

Where exactly should SF-1413 be filed for retention?

In the prime’s project contracts file, alongside the executed subcontract, the wage decision attached at award, the certified payrolls, and any modifications. One folder per sub per project. Most operators store this in a contract management system (Procore Contracts, Contracts Connected, or equivalent) with metadata tags for sub name, contract number, signature date, and project. The retention window is 3 years post final payment under FAR 4.703; 7 years is the safer practical default.

Where this document lives in the system
Contract Operations · Contracts Connected
Product bridge

Contracts Connected fills every subcontract from your own template, the clauses you flow down included, gets it approved by your people and signed in the app, and collects the documents your vendors owe, from bonds to weekly certified payroll. Contracts Connected for federal contractors.

More in Federal compliance

All Federal compliance templates