CUI handling SOP template (construction)

The 10-section written procedure for how your firm identifies, stores, transmits, and destroys CUI.

ExcelWordPDF

The 10-section policy document that turns “we handle CUI correctly” into a written procedure your people can follow, sign off on, and hand to a DCMA auditor. CC CUI Handling SOP. Construction Operations Version 1.0 · Effective [Date] · Owner: Contracts Manager

Why federal-construction firms need a written CUI handling procedure

Every federal-construction firm working on DoD or federal agency projects gets a version of the same conversation at some point. The contracting officer asks how you handle CUI. The prime asks your sub for evidence. A DCMA auditor shows up and wants to see the written procedure. And at that moment, a lot of construction firms realize they’ve been doing the right things in practice without ever writing it down.

That’s the problem this SOP solves. Not because CUI handling requires a 200-page policy manual. It doesn’t. It requires a clear, short, practical document that tells your people exactly what to do with sensitive federal information from the day they receive it to the day the project closes out.

The challenge for construction firms specifically is that CUI doesn’t just live in the office. It lives in the job trailer. It gets printed and pinned to a wall. It gets texted between a super and a PM. It gets pulled up on a personal phone during a site walk. Field operations are inherently distributed, and the standard cybersecurity SOP written for an IT department doesn’t map cleanly onto a 40-person GC running three federal projects simultaneously.

This SOP template is written for that reality. It covers the handling domains where construction operations create CUI exposure: identification and marking, digital storage, physical storage, transmission, field devices, subcontractor flow-down, incident reporting, training, and destruction. Each section states the rule in plain language, gives a construction-specific example, and names who owns it.

What it is not: a substitute for your NIST SP 800-171 System Security Plan, a CMMC assessment, or legal advice on whether your specific contract creates CUI obligations. It’s a standing operating procedure your people can read, follow, and sign off on. The SSP covers what controls you have. This SOP covers what people do with CUI when they’re holding it.

The team that built Contracts Connected has processed compliance documentation on federal construction programs where CUI showed up in budget estimates, agency-furnished specifications, DD-254 attachments, and design-intent drawings. The marking problem is real. The “I thought it was okay to email that” problem is real. This document addresses both.

Who this SOP template is for

  • Federal general contractors operating under contracts that flow CUI from the contracting agency
  • 8(a) certified firms on DoD and federal facility projects where DFARS 252.204-7012 applies
  • Prime contractors who need a written CUI handling procedure as part of their CMMC Level 2 System Security Plan
  • Contracts administrators building the evidence trail for DCMA audits and SPRS submissions
  • Project managers and superintendents who need clear jobsite rules, not a policy written for an IT department

If you’re still working through whether your projects involve CUI at all, start with the CMMC Level 1 self-assessment checklist (construction context) to confirm your scope before adopting this SOP.

The 10 SOP sections the template covers

The SOP covers 10 sections that a real construction-firm CUI handling procedure needs, in the order your team will encounter them:

TitleTextPolicyExample
CUI identification and scope.This section defines what counts as CUI on your projects and how to determine whether a document is in scope. Construction-specific examples include: DD-254 attachments from the contracting officer, agency-furnished design intent drawings marked “For Official Use Only” or “CUI//FEDCON,” non-public schedule data that reveals operational sequencing, and budget breakdowns containing agency-sensitive pricing. Staff should know: if the contracting officer provided it and it wasn’t available to the public before award, treat it as potentially CUI and check the marking before sharing. The owner is the contracts manager, who resolves classification questions before project kickoff.Any document provided non-publicly by the contracting agency, including DD-254 attachments, agency-furnished design drawings, and non-public schedule data, is treated as CUI until confirmed otherwise.Example: USACE-provided facility drawings for a controlled-access building site are CUI//FEDCON. An RFI response that quotes those drawings carries the same marking.
Marking rules for drawings, RFIs, and submittals.When your firm originates a document that contains or re-uses CUI from the agency, that document must carry the CUI marking on every page with the information. Construction documents typically affected: RFI responses quoting agency-furnished specifications, submittal transmittals including proprietary product data tied to a classified government system, and as-built drawings for secure or sensitive facilities. The rule is simple: if a page could stand alone and reveal CUI, it gets the marking. The project manager owns marking on documents the firm originates; the contracts admin owns verification on documents received.Any document your firm originates that contains or re-uses CUI from the agency must carry the CUI marking on every page that includes the information.Example: An RFI response that quotes agency-furnished security specifications must be marked CUI on the transmittal cover and every page containing the spec language.
Approved storage locations for digital CUI files.All CUI files stored digitally must live in one of the firm’s pre-approved storage environments. On a CMMC Level 2 project, that means a FIPS-validated environment: typically Microsoft 365 GCC High, a properly configured SharePoint with appropriate access controls, or an equivalent FedRAMP Moderate or High authorized platform. Prohibited by default: personal Google Drive, personal Dropbox, personal OneDrive, any shared folder link that allows unauthenticated access. The IT lead or compliance officer maintains the approved platform list and updates it when platforms change.All digital CUI files must be stored in pre-approved FIPS-validated environments. Personal cloud storage is prohibited.Example: Microsoft 365 GCC High is approved. Standard OneDrive, Google Drive, and Dropbox are not.
Approved storage for printed CUI documents.Printed CUI is common in construction: drawings posted in trailers, RFI logs printed for field review, agency-provided specifications in binders. The rule: CUI printed material stays in a locked container when not in active use. For job trailers, that means a locked file cabinet or drawer. At the end of each day, nothing marked CUI stays visible or accessible out in the open. At project closeout, all printed CUI is either shredded on-site using a cross-cut shredder (logged per the destruction section) or returned to the agency per the DD-254 instructions.
Email and file-share transmission requirements.CUI may only be transmitted via approved encrypted channels. For email, that means FIPS-validated encryption in transit. Microsoft 365 GCC High email meets this standard; standard Gmail, Outlook.com, and most web-based email clients do not. For file sharing, that means using the firm’s approved platform with role-based access controls, not a public share link. Before forwarding any email with CUI content, confirm all recipients are on the authorized list for that project. The contracts admin maintains the authorized-recipient list for each project and reviews it at every team change.
Field device rules for tablets and BIM viewers.This section defines what devices may access CUI in the field and under what conditions. Permitted: company-issued devices enrolled in the firm’s MDM solution with full-disk encryption enabled, screen-lock enforced (15 minutes or less), and remote-wipe capability confirmed. Not permitted: personal smartphones, personal tablets, personally owned laptops, or any device not enrolled in MDM. The “pull up the drawings on your phone” habit is the most common CUI violation on federal construction sites. If a field supervisor needs to view CUI drawings, they use the company-issued tablet or come to the trailer.
Approved cloud platforms and prohibited tools.Not all cloud tools your firm uses are eligible for CUI. This section lists the firm’s approved platforms by category (email, file storage, project management, BIM) and flags known prohibited tools. Procore requires GCC High or equivalent configuration before CUI drawings are uploaded; standard Procore on AWS is not approved for CUI unless properly configured and assessed. The default rule: if a platform is not on the approved list, it is prohibited for CUI. Project teams that want to add a platform submit a request to IT or compliance before loading any CUI into it.
Subcontractor flow-down and access procedures.When you share CUI with a subcontractor, your DFARS 252.204-7012 obligation flows down. Confirm the sub is at the right CMMC level before sharing, provide CUI access only via approved channels, and retain a record of what was shared, when, and to whom. Field subs who need to view drawings on-site must do so on the prime’s company device or a sub device that meets the same MDM requirements. The contracts administrator maintains the CUI-sharing log for each project.
Incident reporting and the 72-hour clock.If CUI is involved in a potential incident (unauthorized access, a lost device, an email sent to the wrong recipient, ransomware on a system containing CUI), the clock starts immediately. Under DFARS 252.204-7012, the firm has 72 hours to report the incident to the contracting agency via the DIBNet portal at dibnet.dod.mil. This section defines who triggers the incident response, who is the incident coordinator, and the three immediate steps: contain, preserve evidence, notify. Waiting to see if it blows over before reporting is not an option.
Annual training acknowledgment and refresh.Every employee with access to CUI signs a training acknowledgment annually. New employees sign before receiving CUI access. The acknowledgment covers: what CUI is and how to identify it, the firm’s approved storage and transmission rules, the field device policy, how to report a suspected incident, and who to call with questions. The training record includes the employee’s name, role, project assignments, and signature with date. The compliance officer or contracts admin maintains the training roster and sends 30-day advance notices before each employee’s annual renewal date.

How to adopt and maintain this SOP at your firm

Adopt this SOP in three steps. First, read through every section and fill in the firm-specific blanks: the name of your approved storage platform, your MDM solution, the pre-designated incident coordinator, and the contracting officer contact for each active federal project. Second, have every employee with CUI access read the document and sign the training acknowledgment form before receiving any CUI. Third, review and update the SOP at least annually and immediately after any incident, platform change, or new federal contract award that changes your CUI scope. Keep the signed acknowledgments in the same contracts binder as your SPRS submissions and DD-254 attachments. That is what a DCMA auditor wants to see.

Stop managing CUI manually across every project

The SOP is the written rule. The harder problem is getting 40 people across three federal projects to follow it, proving they did, and catching exceptions before they become incidents. Multiply that across every new contract award and you’ve built a compliance tracking job on top of an operations job. Contracts Connected’s approval workflows give you a structured way to log CUI access events, route training acknowledgments for signature, flag when a device falls out of MDM compliance, and build the evidence trail your DCMA auditor will eventually request. No part-time compliance hire needed.

For educational purposes. These templates, checklists, and trackers are operator-built starting points designed to help you move faster on the kind of work that usually drowns construction admins in email chains. They are not legal, insurance, accounting, or tax advice. Each project, jurisdiction, and contract has its own quirks. Review the document, refine the language, and consult your attorney, broker, CPA, or compliance officer before relying on it for a live project decision.

Frequently asked questions about CUI handling in construction

How do I know if my project data qualifies as CUI?

Look for explicit CUI markings from the contracting officer. The DD-254 (Contract Security Classification Specification) will state whether your contract involves CUI and at what level. Agency-provided documents marked CUI, CUI//FEDCON, FOUO (legacy marking still in use), or Controlled are in scope. When in doubt before project kickoff, ask the contracting officer’s representative directly. Receiving a document without a marking does not mean it is not CUI. If the document was provided non-publicly by the federal agency and describes facility details, operational schedules, or sensitive design data, treat it as potentially CUI until confirmed otherwise.

Can I email CUI to a subcontractor or supplier?

Only if both parties are using a FIPS-validated encrypted email system. Microsoft 365 GCC High email meets this requirement for most construction firms. Standard Outlook, Gmail, Yahoo Mail, and most web-based email platforms do not. If you need to transmit CUI to a sub who is not on a compliant email system, the options are: give them access to your approved file-share environment with proper access controls, or arrange a compliant hand-off in person or via certified mail for physical documents. Waiting to figure out encryption is not a defense under DFARS 252.204-7012.

Can field staff access CUI on personal phones?

No. Personal devices are not permitted for CUI access under NIST SP 800-171 practice 3.1.19 without explicit approval and equivalent controls in place. The practical reality on a construction site is that personal phones are everywhere and convenient. The SOP draws a hard line: CUI drawings and specifications must be viewed on company-issued devices enrolled in MDM. If a superintendent needs drawings in the field, the answer is a company tablet, not a personal phone photo of the screen.

Do printed drawings count as CUI?

Yes, when they bear CUI markings or when they were provided by the contracting agency as part of the non-public contract package. A printed set of USACE-provided facility drawings for a secure military installation is CUI regardless of whether someone remembered to stamp each sheet. Store printed CUI in a locked container when not in active use, log what was printed, and destroy it properly at project closeout. Cross-cut shred on-site and log the destruction date and person responsible.

What platforms are approved for storing CUI from DoD projects?

Platforms that have achieved FedRAMP Moderate or High authorization or that provide equivalent FIPS-validated controls. In practice for construction firms, Microsoft 365 GCC High is the most common path. Standard Microsoft 365 commercial, Google Workspace, Procore on standard AWS, and Autodesk Construction Cloud on standard infrastructure are not approved for CUI without additional configuration and assessment. Before uploading any CUI to a project management or BIM platform, confirm with your IT lead or compliance officer that the platform has been assessed for your firm’s CUI environment.

Who enforces this SOP on the jobsite?

Enforcement is a shared responsibility with clear ownership by level. The project executive owns overall CUI compliance for each project and is accountable to the contracting officer. The superintendent enforces field rules: device policy, trailer physical security, and sub access. The contracts administrator enforces document handling, the authorized-recipient list, and the training roster. The IT lead owns the approved platform list and MDM enrollment. Nobody on a job site should need to interpret this SOP in the moment. The rules are pre-decided, and the superintendent’s job is to enforce them.

Where this document lives in the system
Back-Office System · Contracts Connected
Product bridge

Contracts Connected tracks every document a vendor owes you against the contract, reads what comes back, and shows who can mobilize, who is compliant on site, and who can be paid. Construction compliance.