  1. How long must a federal construction contractor keep records?
  2. When does the records retention clock actually start?
  3. Which federal contract records have a period shorter than 3 years after final payment?
  4. How long must Davis-Bacon certified payroll records be kept?
  5. How long must EEO and affirmative action records be kept?
  6. How long must Form I-9 records be kept?
  7. How long must OSHA injury and illness records be kept?
  8. How long must payroll and employment tax records be kept?
  9. What is the full federal construction records retention schedule by document type?
  10. When can a contract clause require longer retention than the regulation?
  11. What does this page not cover?
  12. How does Contracts Connected keep a retention schedule from becoming a guess?
  13. Frequently asked questions
  14. Primary sources

Every record class a federal construction contractor holds, with its retention period, the event that starts the clock, and the citation that governs it.

How long must a federal construction contractor keep records?

A federal construction contractor must keep most contract records for 3 years after final payment under FAR 4.703, but that single number is wrong for the records that matter most. Davis-Bacon payroll runs 3 years after all work on the prime contract is completed. OSHA logs run 5 years from the calendar year, and employment tax records run 4 years.

The three year rule is real, and it is the one most people can recite. It is also the narrowest of the rules on this page. FAR 4.703(a) requires contractors to make records available for 3 years after final payment, or for the specific period at FAR 4.705 through 4.705-3 where one applies, whichever of those expires first. Two details in that sentence do most of the damage when they get lost. The first is that the rule attaches to the contract file, not to everything in your building. The second is that several record classes carry their own period that is shorter or longer, and the specific period wins where it expires first.

There is also a scope question worth settling before you build a schedule. FAR 4.702(a) applies Subpart 4.7 to records generated under contracts containing either the Audit and Records clause for sealed bidding at FAR 52.214-26 or the Audit and Records clause for negotiation at FAR 52.215-2. If neither clause is in your contract, Subpart 4.7 is not what governs you, and you are working from your contract terms and the labor, tax, and safety rules instead. FAR 4.700 also settles a question subcontractors ask constantly: in that subpart, the terms “contracts” and “contractors” include “subcontracts” and “subcontractors.” The obligation runs down.

One numbering change is coming. Under the FAR overhaul, the model deviation for Part 4 keeps Subpart 4.7 but folds the record lists at FAR 4.705-1 through 4.705-3 into a single Table 4-4 at FAR 4.705, and the proposed rule published June 23, 2026 (91 FR 37550) would move the subpart to FAR 4.400 through 4.405. The periods and clock start events in both texts match the codified rule this page cites. If your agency has adopted the Part 4 class deviation, your contract documents may cite the new numbers. The obligations do not change.

The scale of federal contract auditing is worth understanding before you decide a retention schedule is a paperwork exercise. According to the Defense Contract Audit Agency’s fiscal year 2025 Management Discussion and Analysis, DCAA examined $788.4 billion in contract costs during FY 2025 and identified $5.3 billion in savings.

When does the records retention clock actually start?

The clock start depends on the record class, and there are five different starting events in play across the rules on this page: final payment on the contract, the end of the contractor’s fiscal year in which a cost entry was made, completion of all work on the prime contract, the end of the calendar year covered, and a date tied to an individual’s employment. Getting the period right and the start event wrong produces a schedule that is confidently incorrect.

The FAR 4.705 specific periods do not run from final payment at all. They run from a fiscal year cutoff:

“The retention periods in 4.705 are calculated from the end of the contractor’s fiscal year in which an entry is made charging or allocating a cost to a Government contract or subcontract. If a specific record contains a series of entries, the retention period is calculated from the end of the contractor’s fiscal year in which the final entry is made.”

FAR 4.704(a)

That paragraph carries two more rules people miss. Where a record holds a series of entries, the period runs from the fiscal year of the final entry, not the first. And FAR 4.704(a) tells you what to do operationally: cut the records off in annual blocks and retain them for block disposal. FAR 4.704(b) adds a case that catches repeat performers, which is most federal construction firms. Where records from a prior contract were relied on for certified cost or pricing data in negotiating a succeeding contract, the periods run from the date of the succeeding contract, so winning follow-on work quietly restarts the clock on the old file. FAR 4.704(c) closes the practical loophole: where two or more record categories are interfiled and screening for disposal is not practical, you retain the entire series for the longest period that applies to any category in it.

The starting event that produces the most surprise belongs to Davis-Bacon, and it is covered in its own section below, because it runs from a date the record holder often does not control.

Which federal contract records have a period shorter than 3 years after final payment?

FAR 4.705-1, 4.705-2, and 4.705-3 assign 2 year and 4 year periods to specific record classes, and under FAR 4.703(a) the shorter of the 3 year rule and the specific period governs where the specific one expires first. The 2 year classes are labor cost distribution cards, petty cash records, clock cards and other time and attendance cards, paid checks and receipts for wages paid in cash, and store requisitions for materials, supplies, equipment, and services.

Everything else enumerated in those three sections carries 4 years. Financial and cost accounting records at FAR 4.705-1 include accounts receivable invoices and their registers, material and work order and service order files, cash advance recapitulations, paid and canceled and voided checks other than payroll, and accounts payable records including vendor invoices and receiving and inspection reports. Pay administration records at FAR 4.705-2 include payroll sheets and registers, change slips, and tax withholding statements. Acquisition and supply records at FAR 4.705-3 include work orders for maintenance and other services, equipment usage and status reports and repair orders, expendable property records, receiving and inspection report records, purchase order files including the memoranda of negotiation showing the principal elements of subcontract price negotiations, production records of quality control and reliability and inspection, and government property records.

One line in FAR 4.705 does more work than its length suggests: records are identified in the subpart by their purpose or use, not by name or form number. The regulation says plainly that the descriptive identifications may not match your filing practice, and that they apply anyway to any record that fits the description. Your folder names do not control the analysis. What the record is for does.

DCAA issued 2,480 audit reports and 7,047 memos in fiscal year 2025, producing a return on investment of about $7.6 per $1 spent, per the agency’s FY 2025 Management Discussion and Analysis. Records get looked at.

How long must Davis-Bacon certified payroll records be kept?

Certified payrolls must be preserved for 3 years after all the work on the prime contract is completed, not 3 years from the week the payroll was submitted and not 3 years from your own last day on site. The regulation is direct about it:

“Length of certified payroll retention. The contractor or subcontractor must preserve all certified payrolls during the course of the work and for a period of 3 years after all the work on the prime contract is completed.”

29 CFR 5.5(a)(3)(ii)(G)

This is the retention clock federal subcontractors most often get wrong, and the error is structural rather than careless. The event that starts the clock belongs to the prime contract, which means a subcontractor who completes a scope in year one of a five year prime holds those weekly payrolls until three years after the whole job closes out, roughly eight years after the work was performed. Nothing in the subcontractor’s own records tells them when that date arrives. They have to ask.

Two neighboring paragraphs run on the same clock and get forgotten. Under 29 CFR 5.5(a)(3)(i)(A), all regular payrolls and other basic records must be preserved for at least 3 years after all the work on the prime contract is completed, and those records have to carry name, Social Security number, last known address and telephone number and email address, correct classification of work actually performed, hourly wage rates including fringe contributions, daily and weekly hours in total and per covered contract, deductions, and actual wages paid. Under 29 CFR 5.5(a)(3)(iii), the contract or subcontract itself and related documents including bids, proposals, amendments, modifications, and extensions must be preserved on the same three year post completion clock.

There is a wording gap worth knowing about. The FAR clause at 52.222-8(a) says payrolls and basic records shall be preserved “for a period of 3 years thereafter,” measured from the course of the work, while the Department of Labor regulation at 29 CFR 5.5(a)(3) measures from completion of all work on the prime contract. Where the two readings diverge, the prime contract completion measure is the longer and safer one to build a schedule against.

The enforcement volume behind these records is public. Department of Labor Wage and Hour Division data shows 641 concluded compliance actions under the Davis-Bacon and Related Acts in fiscal year 2025, recovering $26,754,050 in back wages for 5,812 employees. Across all statutes it enforces, WHD recorded 1,802 compliance actions in the construction industry in FY 2025 and $43,420,356 in back wages for 18,340 construction employees. For how classification and fringe validation gets handled at submission rather than reconstructed years later, see certified payroll software for construction→.

How long must EEO and affirmative action records be kept?

Personnel and employment records under the disability and protected veteran rules must be preserved for 2 years from the date the record was made or the personnel action was taken, whichever occurs later, dropping to 1 year if the contractor has fewer than 150 employees or does not have a government contract at or above a dollar threshold. That threshold is $150,000 under 41 CFR 60-741.80(a) for Section 503 of the Rehabilitation Act, and $200,000 under 41 CFR 60-300.80(a) for VEVRAA, effective September 21, 2026 (91 FR 54234). Both rules add a specific case: for an involuntary termination, the terminated individual’s personnel records are kept 2 years from the date of termination, or 1 year for contractors below those thresholds. Both rules reach the same personnel files, so the longer period controls: a contractor with 150 or more employees and a contract of at least $150,000 but under $200,000 still keeps them 2 years under Section 503.

This is the one area on the page where the regulatory ground has moved, and any schedule you write should reflect it. Executive Order 11246 was revoked by Executive Order 14173 on January 21, 2025, published at 90 FR 8633. On August 21, 2026 the Department of Labor published a final rule (91 FR 54444) that removes the Executive Order 11246 regulations at 41 CFR part 60-1, including the record retention rule at 41 CFR 60-1.12, effective October 26, 2026. Before that date, 60-1.12 applies with the same two year and one year structure; from that date it is no longer in the Code of Federal Regulations. The Section 503 and VEVRAA recordkeeping rules are not part of that rescission and continue to apply. The final rule says nothing about records already on hand. Talk to counsel before you dispose of records kept under 60-1.12, and keep anything tied to an open complaint, evaluation, or claim. The Department’s FY 2025 performance reporting also records that the Secretary directed OFCCP to close the Executive Order 11246 portion of open compliance evaluations and to hold Section 503 and VEVRAA activity, and that the abeyance was lifted on July 2, 2025.

Two provisions outlast the rescission. Where a contractor has notice that a complaint has been filed, a compliance evaluation has been initiated, or an enforcement action has begun, 41 CFR 60-741.80(a) and 60-300.80(a) require it to preserve all relevant personnel records until final disposition, which suspends normal disposal. And 41 CFR 60-741.80(c) and 60-300.80(c) attach a consequence to getting it wrong: failure to preserve is itself noncompliance, and where records were destroyed or not preserved “there may be a presumption that the information destroyed or not preserved would have been unfavorable to the contractor.” Per the Department of Labor’s FY 2025 annual performance reporting, OFCCP received 1,414 complaints from workers in fiscal year 2025 and processed 531 pre-complaint inquiries.

How long must Form I-9 records be kept?

A Form I-9 must be retained for three years after the date of hire or one year after the date employment is terminated, whichever is later, under 8 CFR 274a.2(b)(2)(i)(A). The words “whichever is later” carry the entire rule, and reading them as “whichever is sooner” is the most common I-9 retention error in construction, where crews turn over constantly and tenure varies wildly across the same jobsite.

Work the two cases and the shape becomes obvious. A worker employed for six months generates a form retained three years from the date of hire, because that is the later of the two dates. A worker employed for ten years generates a form retained until one year after they leave, roughly eleven years from hire. On a payroll with both, a single flat rule destroys one set early and holds the other set years past any need. The form has to be indexed by hire date and termination date, not by project.

The production timeline is short and it is set by regulation, not by negotiation. Under 8 CFR 274a.2(b)(2)(ii), an employer is entitled to at least three business days notice before an inspection of Forms I-9, and the forms have to be available at the location where the request for production was made, or the employer has to tell the inspecting officer where they are and make arrangements. Immigration and Customs Enforcement’s Form I-9 inspection fact sheet, updated March 16, 2026, describes the same three business day window to produce and adds that where technical or procedural failures are found, the employer gets at least ten business days to correct them, after which uncorrected failures become substantive violations. The same fact sheet notes that an employer found to have knowingly hired or continued to employ unauthorized workers may be subject to debarment under FAR 9.406-2(b)(2), which is a federal contracting consequence rather than an immigration one.

How long must OSHA injury and illness records be kept?

You must save the OSHA 300 Log, the privacy case list if one exists, the annual summary, and the OSHA 301 incident report forms for five years following the end of the calendar year that the records cover, under 29 CFR 1904.33(a). Five years is the longest fixed period on this page, and the calendar year start makes it the easiest one to administer.

It is also the only rule in this set that requires you to reach back into an archive and change something. Under 29 CFR 1904.33(b)(1), during the five year storage period you must update stored OSHA 300 Logs to include newly discovered recordable injuries or illnesses and to show any change in the classification of a previously recorded case, removing or lining out the original entry and entering the new information. The annual summary and the 301 forms do not have to be updated. A retention system that treats archived records as frozen will silently fail this requirement.

Construction contractors do not get out of this on industry grounds. The partial exemption at 29 CFR 1904.1 turns on company size, exempting companies with 10 or fewer employees at all times during the last calendar year, not on being a construction firm. Separately, 29 CFR 1904.41(a)(2) requires establishments with 100 or more employees in the industries designated in Appendix B to submit information from OSHA Forms 300 and 301 electronically each year, and that appendix includes NAICS 2381, foundation, structure, and building exterior contractors. The Bureau of Labor Statistics Survey of Occupational Injuries and Illnesses reported that private industry employers logged 2.5 million nonfatal workplace injuries and illnesses in 2024, at a total recordable case rate of 2.3 cases per 100 full time equivalent workers. Every one of those is an entry that has to survive five years and stay correctable.

How long must payroll and employment tax records be kept?

Employment tax records must be kept for at least four years after the due date of the tax for the return period to which the records relate, or the date the tax is paid, whichever is later, under 26 CFR 31.6001-1(e)(2). Records supporting a refund, credit, or abatement claim run at least four years from the date the claim is filed.

The complication for a federal construction contractor is not the four years. It is that one payroll file sits underneath three separate regimes at once. The tax rule gives four years from a tax due date. FAR 4.705-2(a) gives four years for payroll sheets, registers, change slips, and tax withholding statements, measured from the end of the fiscal year of the cost entry, and only two years for clock cards and for paid checks or cash wage receipts. The Fair Labor Standards Act rules give three years for payroll records at 29 CFR 516.5(a), measured from the last date of entry, and two years for supplementary basic records including time cards and wage rate tables at 29 CFR 516.6(a). Layer Davis-Bacon on a covered project and the same time record is also subject to the three year post completion clock.

The practical rule that falls out of this is unglamorous and correct: for any given payroll artifact, find every regime that reaches it, then keep it for the longest applicable period measured from the latest applicable start event. FAR 4.704(c) says essentially this for interfiled federal contract records, and it is the right default everywhere else. In fiscal year 2025 the Wage and Hour Division recovered more than $259 million in back wages for 176,957 employees nationwide, averaging $1,465 per worker, which is the reconstruction burden these records exist to prevent.

What is the full federal construction records retention schedule by document type?

The matrix below is the reference. Period is the minimum. Clock start is the event the period is measured from, which is the column most schedules omit and the one that determines whether you are actually compliant. Citation is the governing authority for that row.

Document typeRetention periodClock starts atGoverning citation
FEDERAL CONTRACT FILE
Contract records generally: books, documents, accounting procedures and practices, and other supporting evidence3 yearsFinal payment under the contractFAR 4.703(a)(1); FAR 52.215-2(f)
Records relating to a terminated portion of the contract3 yearsThe resulting final termination settlementFAR 52.215-2(f)(1)
Records relating to appeals, litigation, or settlement of claimsUntil finally resolved, no fixed endNot applicable, the obligation runs until resolutionFAR 52.215-2(f)(2)
FINANCIAL AND COST ACCOUNTING (FAR 4.705-1)
Accounts receivable invoices, adjustments, invoice registers, carrier freight bills, shipping orders4 yearsEnd of the contractor's fiscal year of the cost entryFAR 4.705-1(a); FAR 4.704(a)
Material, work order, or service order files4 yearsEnd of fiscal year of the cost entryFAR 4.705-1(b)
Cash advance recapitulations4 yearsEnd of fiscal year of the cost entryFAR 4.705-1(c)
Paid, canceled, and voided checks other than salary and wages4 yearsEnd of fiscal year of the cost entryFAR 4.705-1(d)
Accounts payable records: vendor invoices, remittance advices, receiving and inspection reports, debit and credit memoranda4 yearsEnd of fiscal year of the cost entryFAR 4.705-1(e)
Labor cost distribution cards or equivalent2 yearsEnd of fiscal year of the cost entryFAR 4.705-1(f)
Petty cash records2 yearsEnd of fiscal year of the cost entryFAR 4.705-1(g)
PAY ADMINISTRATION (FAR 4.705-2)
Payroll sheets and registers, change slips, tax withholding statements4 yearsEnd of fiscal year of the cost entryFAR 4.705-2(a)
Clock cards or other time and attendance cards2 yearsEnd of fiscal year of the cost entryFAR 4.705-2(b)
Paid checks, receipts for wages paid in cash, other evidence of payment for services2 yearsEnd of fiscal year of the cost entryFAR 4.705-2(c)
ACQUISITION AND SUPPLY (FAR 4.705-3)
Store requisitions for materials, supplies, equipment, and services2 yearsEnd of fiscal year of the cost entryFAR 4.705-3(a)
Work orders for maintenance and other services4 yearsEnd of fiscal year of the cost entryFAR 4.705-3(b)
Equipment usage and status reports, equipment repair orders4 yearsEnd of fiscal year of the cost entryFAR 4.705-3(c)
Expendable property records4 yearsEnd of fiscal year of the cost entryFAR 4.705-3(d)
Receiving and inspection report records4 yearsEnd of fiscal year of the cost entryFAR 4.705-3(e)
Purchase order files and supporting documentation, including memoranda of subcontract price negotiation4 yearsEnd of fiscal year of the cost entryFAR 4.705-3(f)
Production records of quality control, reliability, and inspection4 yearsEnd of fiscal year of the cost entryFAR 4.705-3(g)
Government property records4 yearsEnd of fiscal year of the cost entryFAR 4.705-3(h)
DAVIS-BACON AND LABOR STANDARDS
Certified payrolls (WH-347 or equivalent)3 yearsCompletion of all work on the prime contract29 CFR 5.5(a)(3)(ii)(G)
Regular payrolls and other basic records for laborers and mechanicsAt least 3 yearsCompletion of all work on the prime contract29 CFR 5.5(a)(3)(i)(A)
Contract or subcontract and related documents: bids, proposals, amendments, modifications, extensions3 yearsCompletion of all work on the prime contract29 CFR 5.5(a)(3)(iii)
FLSA payroll records3 yearsLast date of entry29 CFR 516.5(a)
FLSA supplementary records: time cards, wage rate tables2 yearsDate of last entry, or last effective date29 CFR 516.6(a)
EEO AND AFFIRMATIVE ACTION
Personnel and employment records, Section 503 disability2 years, or 1 year if fewer than 150 employees or no contract of at least $150,000Making of the record or the personnel action, whichever is later41 CFR 60-741.80(a)
Personnel and employment records, VEVRAA protected veterans2 years, or 1 year if fewer than 150 employees or no contract of at least $200,000Making of the record or the personnel action, whichever is later41 CFR 60-300.80(a)
Personnel and employment records, EO 11246 rule, removal effective October 26, 20262 years, or 1 year if fewer than 150 employees or no contract of at least $150,000, until the rule's removal on October 26, 2026Making of the record or the personnel action, whichever is later41 CFR 60-1.12(a); removed by 91 FR 54444, see the caveat above
Records relevant to a complaint, compliance evaluation, or enforcement actionUntil final dispositionNotice of the complaint, evaluation, or action41 CFR 60-741.80(a); 41 CFR 60-300.80(a)
IMMIGRATION
Form I-93 years after hire, or 1 year after employment ends, whichever is laterDate of hire, and date employment ends8 CFR 274a.2(b)(2)(i)(A)
SAFETY
OSHA 300 Log, privacy case list, 300A annual summary, 301 incident reports5 years, with the 300 Log updated during storageEnd of the calendar year the records cover29 CFR 1904.33(a); update duty at 1904.33(b)(1)
TAX
Employment tax recordsAt least 4 yearsDue date of the tax for the return period, or date the tax is paid, whichever is later26 CFR 31.6001-1(e)(2)
Records supporting a refund, credit, or abatement claimAt least 4 yearsDate the claim is filed26 CFR 31.6001-1(e)(2)

Want this as a working schedule rather than a reference table? Take the records retention schedule for federal contractors→, or the commercial records retention schedule→ for private work.

When can a contract clause require longer retention than the regulation?

A contract clause beats the regulation whenever it runs longer, because FAR 4.703(b)(1) states that contractors must make records available for a longer period than the general rule if a longer retention period is specified in any contract clause. The regulatory period is a floor. Agency supplements, program specific clauses, and terms a prime flows down into a subcontract can all extend it, so the operative period for a given job is the longest one that reaches the record.

Three extension mechanisms are worth knowing by name. First, FAR 4.703(b)(3) automatically extends the FAR 4.705 periods by one day for every day a contractor misses the original due date for submitting final indirect cost rate proposals under FAR 52.216-7(d)(2). A late proposal quietly lengthens retention on the whole record set. Second, FAR 52.215-2(g) requires the audit and records clause to be inserted in subcontracts above the simplified acquisition threshold that are cost-reimbursement, incentive, time-and-materials, labor-hour, or price-redeterminable type, that require certified cost or pricing data, or that require the reports discussed in that clause. The retention obligation is designed to travel down the tiers. Third, 29 CFR 5.5(a)(3) applies to the contractor and any subcontractor by its own terms on Davis-Bacon covered work.

There is one asymmetry that gets read backwards, so it is worth stating plainly. FAR 4.703(b)(2) addresses what happens when you keep records longer than required for your own business reasons. In that case the retention period for government access purposes is your own retention period or 3 years after final payment, whichever expires first. Keeping a document forever does not by itself extend the government’s access right forever, and it also does not shorten any independent obligation from the labor, tax, safety, or immigration rules. Those run on their own terms regardless.

Retention is also useless without retrievability, which is a separate discipline. FAR 4.703(c) permits imaging and electronic storage instead of originals, but only where the contractor has procedures ensuring the imaging process preserves accurate images including signatures, maintains an effective indexing system permitting timely and convenient access to the imaged records, and retains the original records for a minimum of one year after imaging to allow periodic validation. FAR 4.703(d) adds that computer-held data must be kept on reliable media with an audit trail describing any transfer, and that contractors must not destroy, discard, delete, or write over that data during the prescribed periods. See document chain of custody in construction→ for what indexing to that standard actually requires.

What does this page not cover?

This page is a retention reference. It does not tell you how to respond to an audit or a document request, and it is not legal advice. Three limits matter enough to state directly.

A litigation hold or an open audit suspends destruction regardless of any schedule on this page. This is the single most important sentence here, and it overrides every period in the matrix. The obligation is written into the clause itself:

“The Contractor shall make available records relating to appeals under the Disputes clause or to litigation or the settlement of claims arising under or relating to this contract until such appeals, litigation, or claims are finally resolved.”

FAR 52.215-2(f)(2)

There is no fixed end date in that paragraph. The same logic appears at 41 CFR 60-741.80(a) and 60-300.80(a), which hold relevant personnel records until final disposition of a complaint, compliance evaluation, or enforcement action, and the consequence of getting it wrong appears at paragraph (c) of each, which allows a presumption that destroyed or unpreserved information would have been unfavorable to the contractor. Destroying records on schedule while a claim, appeal, investigation, or evaluation is open is still spoliation. Suspend the schedule the moment you have notice, and document when and why you suspended it.

Agency supplements and contract-specific clauses are not on this page. DFARS, GSAM, and other agency supplements, along with program specific and prime-flowed clauses, can impose longer periods or additional record classes. Read your actual contract before you rely on the matrix, and ask your contracting officer where a clause is ambiguous.

Several adjacent regimes are deliberately out of scope. Classified information, controlled unclassified information and CMMC obligations, export controlled technical data, state licensing and prevailing wage records, and lien and bond documentation each carry their own retention rules that this page does not address. So do the records governed by your own insurance and surety agreements. Statutes and regulations also change, and this page reflects three 2026 changes: the VEVRAA recordkeeping threshold rose to $200,000 on September 21, 2026, the Executive Order 11246 recordkeeping rule at 41 CFR 60-1.12 is removed effective October 26, 2026, and the FAR overhaul proposes to renumber the records retention subpart. Confirm current requirements with qualified counsel and your contracting officer before you shorten any period or destroy any record.

How does Contracts Connected keep a retention schedule from becoming a guess?

The hard part of records retention was never writing the schedule. It is knowing, four years later, which contract a given document belongs to, which requirement it satisfied, and which of the five clock start events applies to it. Contracts Connected tags every document to its contract, its subcontractor, and the obligation it proves the moment it enters the system, so the retention period attached to it is derived from what the record is rather than from which folder someone dropped it in.

That matters most for the two clocks nobody can compute locally. A certified payroll cannot be disposed of until three years after the prime contract is complete, and a Form I-9 cannot be disposed of until the later of two dates that depend on an individual’s employment history. Both require the system to know something the document itself does not say. Our co-founder ran a large federal general contracting firm for 15 years, about 100,000 documents a year.

Related reading: Document management software for federal contractors→ and Construction compliance software for federal GCs→.

Frequently asked questions

How long must a federal contractor keep records?

Under FAR 4.703(a), a federal contractor must make contract records available for 3 years after final payment, or for the specific shorter period at FAR 4.705 through 4.705-3 where one applies, whichever expires first. That rule governs the contract file only. Certified payroll, Form I-9s, OSHA injury records, EEO records, and employment tax records each carry their own period and their own starting event, and several of them run longer than the FAR rule.

When does the federal records retention clock start?

It depends on the record class. The general FAR 4.703 rule runs from final payment on the contract. The specific periods at FAR 4.705 run from the end of the contractor’s fiscal year in which the cost entry was made, per FAR 4.704(a). Davis-Bacon payroll runs from completion of all work on the prime contract. OSHA records run from the end of the calendar year covered. Form I-9 runs from date of hire or end of employment.

How long must certified payroll records be kept on a federal construction project?

Certified payrolls must be preserved during the course of the work and for 3 years after all the work on the prime contract is completed, under 29 CFR 5.5(a)(3)(ii)(G). The clock is tied to the prime contract, not to your own scope. A subcontractor who finishes in year one of a five year prime still holds those payrolls until 3 years after the prime is complete, which can be roughly eight years after the work was performed.

How long must a contractor keep Form I-9 records?

An employer must retain a Form I-9 for three years after the date of hire or one year after the date employment is terminated, whichever is later, under 8 CFR 274a.2(b)(2)(i)(A). Because it is whichever is later, a long tenured worker generates the longer obligation. Someone employed ten years produces a form retained roughly eleven years from hire, while a six month worker produces one retained three years from hire.

Can a contract clause require longer retention than the FAR requires?

Yes. FAR 4.703(b)(1) states that a retention period longer than the general rule controls if one is specified in any contract clause. The regulatory period is a floor, not a ceiling. Agency supplements, program specific clauses, and terms a prime flows into a subcontract can all run longer, so the governing period for any given job is the longest one that applies to that record, not the FAR default.

Does a litigation hold or an open audit change the retention schedule?

Yes, and it overrides the schedule entirely. FAR 52.215-2(f)(2) requires records relating to appeals, litigation, or the settlement of claims to remain available until those matters are finally resolved, with no fixed end date. Under 41 CFR 60-741.80(a) and 60-300.80(a), personnel records relevant to a complaint, compliance evaluation, or enforcement action must be kept until its final disposition. Destroying on schedule during an open matter is still destroying evidence.

Primary sources


This page is provided for educational purposes only and does not constitute legal advice. Retention requirements change and vary by contract type, agency supplement, and program. A litigation hold, open audit, appeal, claim, or compliance evaluation suspends destruction regardless of any period stated here. Confirm current requirements with qualified counsel and your contracting officer before relying on them.

Contracts Connected is the Back-Office System (BOS) for construction.

See what it would take off your plate.

SOC 2 Type II · U.S. hosted · AI optional