  "title": "Mechanics Lien Statistics",
  "url": "https://contractsconnected.com/data/mechanics-lien-statistics",
  "publisher": "Contracts Connected",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "license_name": "CC BY 4.0",
  "reviewed": "November 2026",
  "checked_on": "2026-11-03",
  "note": "Curated and source-checked compilation of published figures. Not Contracts Connected customer data.",
  "downloads": {
    "csv": "https://contractsconnected.com/data/mechanics-lien-statistics.csv",
    "json": "https://contractsconnected.com/data/mechanics-lien-statistics.json"
  },
  "figures": 10,
  "claim_checks": 2,
  "rows": [
    {
      "id": "ncs-credit-2026-lien-index-third-quarter",
      "title": "NCS Credit Lien Index, third quarter 2026",
      "section": "How many liens contractors file",
      "kind": "figure",
      "statistic": "47",
      "wording": "NCS Credit, a credit and collection services firm, says its Lien Index was 47 in the third quarter of 2026, a 16% drop from 56 in the third quarter of 2025. The index is a 0 to 100 score of mechanic's lien filing activity where 50 is neutral, and NCS says the preliminary score will likely be revised upward.",
      "limit": "This index comes from NCS Credit, a credit and collection services firm, and its formula is not published. The score is for the third quarter of 2026, and NCS says it will likely be revised upward.",
      "source_publisher": "NCS Credit",
      "source_title": "Lien Index Q3 2026 (blog post, published October 9, 2026)",
      "source_url": "https://www.ncscredit.com/education-center/blog/lien-index-q3-2026",
      "source_year": "2026",
      "sample_or_method": "Quarterly index of mechanic's lien activity across the U.S. construction industry; the formula and inputs are not published on the page",
      "geography": "US",
      "status": "Reviewed, with limits",
      "checked_on": "2026-11-03",
      "canonical_url": "https://contractsconnected.com/data/mechanics-lien-statistics#ncs-credit-2026-lien-index-third-quarter",
      "cite_as": "Cite as: Contracts Connected, \"NCS Credit Lien Index, third quarter 2026,\" Contracts Connected Data, https://contractsconnected.com/data/mechanics-lien-statistics#ncs-credit-2026-lien-index-third-quarter. Original source: NCS Credit, Lien Index Q3 2026 (blog post, published October 9, 2026), 2026. Reviewed November 2026. Compilation licensed under CC BY 4.0.",
      "license": "https://creativecommons.org/licenses/by/4.0/",
      "changelog": [
        {
          "date": "2026-11-03",
          "type": "Added",
          "note": "Checked against the original source."
        }
      ]
    },
    {
      "id": "ncs-credit-2026-lien-index-first-print-revisions",
      "title": "How NCS revised its first-print Lien Index scores",
      "section": "How many liens contractors file",
      "kind": "figure",
      "statistic": "51 revised to 58",
      "wording": "NCS Credit first reported its first-quarter 2026 Lien Index as 51 and later revised it to 58. It first reported the second quarter of 2026 as 48 and later revised it to 52.",
      "limit": "These are NCS's own revision figures for two quarters. NCS revises first-print scores as recording offices clear backlogs.",
      "source_publisher": "NCS Credit",
      "source_title": "Lien Index Q2 2026 (How to Read the Lien Index), published July 15, 2026",
      "source_url": "https://www.ncscredit.com/education-center/blog/lien-index-q2-2026",
      "source_year": "2026",
      "sample_or_method": "Same index; revision history as stated by NCS in its own posts",
      "geography": "US",
      "status": "Reviewed, with limits",
      "checked_on": "2026-11-03",
      "canonical_url": "https://contractsconnected.com/data/mechanics-lien-statistics#ncs-credit-2026-lien-index-first-print-revisions",
      "cite_as": "Cite as: Contracts Connected, \"How NCS revised its first-print Lien Index scores,\" Contracts Connected Data, https://contractsconnected.com/data/mechanics-lien-statistics#ncs-credit-2026-lien-index-first-print-revisions. Original source: NCS Credit, Lien Index Q2 2026 (How to Read the Lien Index), published July 15, 2026, 2026. Reviewed November 2026. Compilation licensed under CC BY 4.0.",
      "license": "https://creativecommons.org/licenses/by/4.0/",
      "changelog": [
        {
          "date": "2026-11-03",
          "type": "Added",
          "note": "Checked against the original source."
        }
      ]
    },
    {
      "id": "ncs-credit-2026-lien-index-regions-third-quarter",
      "title": "NCS Credit Lien Index by region, third quarter 2026",
      "section": "How many liens contractors file",
      "kind": "figure",
      "statistic": "38 West, 60 South",
      "wording": "NCS Credit's third-quarter 2026 regional Lien Index scores were South 60, West 38, Northeast 42 and Midwest 32. A score above 50 means lien filing activity is rising.",
      "limit": "These are preliminary scores, and NCS expects them to be revised upward.",
      "source_publisher": "NCS Credit",
      "source_title": "Lien Index Q3 2026 (blog post, published October 9, 2026)",
      "source_url": "https://www.ncscredit.com/education-center/blog/lien-index-q3-2026",
      "source_year": "2026",
      "sample_or_method": "Regional cuts of the same quarterly index",
      "geography": "US",
      "status": "Reviewed, with limits",
      "checked_on": "2026-11-03",
      "canonical_url": "https://contractsconnected.com/data/mechanics-lien-statistics#ncs-credit-2026-lien-index-regions-third-quarter",
      "cite_as": "Cite as: Contracts Connected, \"NCS Credit Lien Index by region, third quarter 2026,\" Contracts Connected Data, https://contractsconnected.com/data/mechanics-lien-statistics#ncs-credit-2026-lien-index-regions-third-quarter. Original source: NCS Credit, Lien Index Q3 2026 (blog post, published October 9, 2026), 2026. Reviewed November 2026. Compilation licensed under CC BY 4.0.",
      "license": "https://creativecommons.org/licenses/by/4.0/",
      "changelog": [
        {
          "date": "2026-11-03",
          "type": "Added",
          "note": "Checked against the original source."
        }
      ]
    },
    {
      "id": "levelset-2019-filed-a-mechanics-lien",
      "title": "Construction professionals who have filed a mechanics lien, Levelset 2019",
      "section": "How many liens contractors file",
      "kind": "figure",
      "statistic": "58%",
      "wording": "In an August 2019 Levelset and QuickBooks Time survey of 503 construction professionals, 58% said they have filed a mechanics lien.",
      "limit": "This is a 2019 survey of Levelset's own audience, not a random sample. The share who have ever filed a lien is not the share of unpaid invoices that end in a lien.",
      "source_publisher": "Levelset (a Procore company) with QuickBooks Time",
      "source_title": "Payment Issues, Problems, & Cash Stress Contractors & Subs Deal With (2019 National Construction Payments Report), published October 14, 2019",
      "source_url": "https://levelset.com/blog/2019-national-construction-payments-report",
      "source_year": "2019",
      "sample_or_method": "Survey of 503 construction professionals, conducted August 2019; respondents are Levelset's audience, not a random sample",
      "geography": "US",
      "status": "Reviewed, with limits",
      "checked_on": "2026-11-03",
      "canonical_url": "https://contractsconnected.com/data/mechanics-lien-statistics#levelset-2019-filed-a-mechanics-lien",
      "cite_as": "Cite as: Contracts Connected, \"Construction professionals who have filed a mechanics lien, Levelset 2019,\" Contracts Connected Data, https://contractsconnected.com/data/mechanics-lien-statistics#levelset-2019-filed-a-mechanics-lien. Original source: Levelset (a Procore company) with QuickBooks Time, Payment Issues, Problems, & Cash Stress Contractors & Subs Deal With (2019 National Construction Payments Report), published October 14, 2019, 2019. Reviewed November 2026. Compilation licensed under CC BY 4.0.",
      "license": "https://creativecommons.org/licenses/by/4.0/",
      "changelog": [
        {
          "date": "2026-11-03",
          "type": "Added",
          "note": "Checked against the original source."
        }
      ]
    },
    {
      "id": "census-2026-construction-spending-september",
      "title": "US construction spending, September 2026",
      "section": "How many liens contractors file",
      "kind": "figure",
      "statistic": "$2,186.1 billion",
      "wording": "The Census Bureau estimated construction spending at a seasonally adjusted annual rate of $2,186.1 billion in September 2026, 2.7% below September 2025 ($2,245.8 billion).",
      "limit": "It is an estimate, and the Census Bureau revises it. It shows the size of the market, not lien activity.",
      "source_publisher": "U.S. Census Bureau",
      "source_title": "Monthly Construction Spending, September 2026 (Release CB26-176, November 2, 2026)",
      "source_url": "https://www.census.gov/construction/c30/pdf/release.pdf",
      "source_year": "2026",
      "sample_or_method": "Monthly Value of Construction Put in Place survey; seasonally adjusted annual rate; estimate with a margin of error",
      "geography": "US",
      "status": "Reviewed",
      "checked_on": "2026-11-03",
      "canonical_url": "https://contractsconnected.com/data/mechanics-lien-statistics#census-2026-construction-spending-september",
      "cite_as": "Cite as: Contracts Connected, \"US construction spending, September 2026,\" Contracts Connected Data, https://contractsconnected.com/data/mechanics-lien-statistics#census-2026-construction-spending-september. Original source: U.S. Census Bureau, Monthly Construction Spending, September 2026 (Release CB26-176, November 2, 2026), 2026. Reviewed November 2026. Compilation licensed under CC BY 4.0.",
      "license": "https://creativecommons.org/licenses/by/4.0/",
      "changelog": [
        {
          "date": "2026-11-03",
          "type": "Added",
          "note": "Checked against the original source."
        }
      ]
    },
    {
      "id": "florida-statutes-713-08-claim-of-lien-within-90-days",
      "title": "Florida deadline to record a claim of lien",
      "section": "What state law says about lien deadlines and waivers",
      "kind": "figure",
      "statistic": "90 days",
      "wording": "In Florida, a claim of lien may be recorded no later than 90 days after the lienor finishes furnishing labor, services or materials. The recorded claim may stay valid for one year unless the owner acts to shorten that.",
      "limit": "This is the 2025 edition of the statute, the latest with text online in November 2026. Florida amends this chapter from time to time.",
      "source_publisher": "Florida Legislature",
      "source_title": "Florida Statutes 713.08 (2025), Claim of lien",
      "source_url": "https://www.flsenate.gov/Laws/Statutes/2025/713.08",
      "source_year": "2025 statutes",
      "sample_or_method": "State statute text, 2025 edition",
      "geography": "US",
      "status": "Reviewed",
      "checked_on": "2026-11-03",
      "canonical_url": "https://contractsconnected.com/data/mechanics-lien-statistics#florida-statutes-713-08-claim-of-lien-within-90-days",
      "cite_as": "Cite as: Contracts Connected, \"Florida deadline to record a claim of lien,\" Contracts Connected Data, https://contractsconnected.com/data/mechanics-lien-statistics#florida-statutes-713-08-claim-of-lien-within-90-days. Original source: Florida Legislature, Florida Statutes 713.08 (2025), Claim of lien, 2025 statutes. Reviewed November 2026. Compilation licensed under CC BY 4.0.",
      "license": "https://creativecommons.org/licenses/by/4.0/",
      "changelog": [
        {
          "date": "2026-11-03",
          "type": "Added",
          "note": "Checked against the original source."
        }
      ]
    },
    {
      "id": "florida-statutes-713-20-advance-waiver-unenforceable",
      "title": "Florida rule on waiving lien rights in advance",
      "section": "What state law says about lien deadlines and waivers",
      "kind": "figure",
      "statistic": "unenforceable",
      "wording": "Florida law says a right to claim a lien may not be waived in advance, and an advance waiver is unenforceable. A person also may not require a lienor to sign a waiver form that differs from the statutory forms.",
      "limit": "Applies to Florida only. Other states vary.",
      "source_publisher": "Florida Legislature",
      "source_title": "Florida Statutes 713.20 (2025), Waiver of lien",
      "source_url": "https://www.flsenate.gov/Laws/Statutes/2025/713.20",
      "source_year": "2025 statutes",
      "sample_or_method": "State statute text, subsections (2) and (6)",
      "geography": "US",
      "status": "Reviewed",
      "checked_on": "2026-11-03",
      "canonical_url": "https://contractsconnected.com/data/mechanics-lien-statistics#florida-statutes-713-20-advance-waiver-unenforceable",
      "cite_as": "Cite as: Contracts Connected, \"Florida rule on waiving lien rights in advance,\" Contracts Connected Data, https://contractsconnected.com/data/mechanics-lien-statistics#florida-statutes-713-20-advance-waiver-unenforceable. Original source: Florida Legislature, Florida Statutes 713.20 (2025), Waiver of lien, 2025 statutes. Reviewed November 2026. Compilation licensed under CC BY 4.0.",
      "license": "https://creativecommons.org/licenses/by/4.0/",
      "changelog": [
        {
          "date": "2026-11-03",
          "type": "Added",
          "note": "Checked against the original source."
        }
      ]
    },
    {
      "id": "arizona-ars-33-993-record-lien-within-120-days",
      "title": "Arizona deadline to record a lien",
      "section": "What state law says about lien deadlines and waivers",
      "kind": "figure",
      "statistic": "120 days",
      "wording": "In Arizona, a lien must be recorded within 120 days after completion of the building or improvement, or within 60 days after a notice of completion is recorded.",
      "limit": "This card covers the recording deadline only, not the deadline to enforce the lien.",
      "source_publisher": "Arizona Legislature",
      "source_title": "A.R.S. 33-993, Duration of lien; time for recording",
      "source_url": "https://www.azleg.gov/ars/33/00993.htm",
      "source_year": "current statute text",
      "sample_or_method": "State statute text",
      "geography": "US",
      "status": "Reviewed",
      "checked_on": "2026-11-03",
      "canonical_url": "https://contractsconnected.com/data/mechanics-lien-statistics#arizona-ars-33-993-record-lien-within-120-days",
      "cite_as": "Cite as: Contracts Connected, \"Arizona deadline to record a lien,\" Contracts Connected Data, https://contractsconnected.com/data/mechanics-lien-statistics#arizona-ars-33-993-record-lien-within-120-days. Original source: Arizona Legislature, A.R.S. 33-993, Duration of lien; time for recording, current statute text. Reviewed November 2026. Compilation licensed under CC BY 4.0.",
      "license": "https://creativecommons.org/licenses/by/4.0/",
      "changelog": [
        {
          "date": "2026-11-03",
          "type": "Added",
          "note": "Checked against the original source."
        }
      ]
    },
    {
      "id": "miller-act-40-usc-3133-notice-90-days-suit-one-year",
      "title": "Miller Act deadlines to claim on a federal payment bond",
      "section": "Federal public work: bond claims instead of liens",
      "kind": "figure",
      "statistic": "90 days, one year",
      "wording": "On federal construction jobs covered by the Miller Act, a person with no direct contract with the prime contractor must give written notice within 90 days to claim on the payment bond, and must sue no later than one year after the last labor or material.",
      "limit": "Applies to federal construction work, where there is no lien on the building; the bond is the claim.",
      "source_publisher": "Office of the Law Revision Counsel, via Cornell Legal Information Institute",
      "source_title": "40 U.S.C. 3133 (Rights of persons furnishing labor or material)",
      "source_url": "https://www.law.cornell.edu/uscode/text/40/3133",
      "source_year": "statute (current text)",
      "sample_or_method": "Federal statute text",
      "geography": "US",
      "status": "Reviewed",
      "checked_on": "2026-11-03",
      "canonical_url": "https://contractsconnected.com/data/mechanics-lien-statistics#miller-act-40-usc-3133-notice-90-days-suit-one-year",
      "cite_as": "Cite as: Contracts Connected, \"Miller Act deadlines to claim on a federal payment bond,\" Contracts Connected Data, https://contractsconnected.com/data/mechanics-lien-statistics#miller-act-40-usc-3133-notice-90-days-suit-one-year. Original source: Office of the Law Revision Counsel, via Cornell Legal Information Institute, 40 U.S.C. 3133 (Rights of persons furnishing labor or material), statute (current text). Reviewed November 2026. Compilation licensed under CC BY 4.0.",
      "license": "https://creativecommons.org/licenses/by/4.0/",
      "changelog": [
        {
          "date": "2026-11-03",
          "type": "Added",
          "note": "Checked against the original source."
        }
      ]
    },
    {
      "id": "far-28-102-1-payment-bond-150000",
      "title": "Federal payment bond line for construction contracts",
      "section": "Federal public work: bond claims instead of liens",
      "kind": "figure",
      "statistic": "$150,000",
      "wording": "Federal rules require a payment bond on any federal construction contract over $150,000. For contracts over $35,000 up to $150,000, the contracting officer picks at least two payment protections such as a bond, an irrevocable letter of credit or an escrow.",
      "limit": "This line applies to federal contracts. State little Miller Acts set their own lines.",
      "source_publisher": "General Services Administration, Department of Defense and NASA (FAR)",
      "source_title": "FAR 28.102-1 Bonds or other security",
      "source_url": "https://www.acquisition.gov/far/28.102-1",
      "source_year": "statute (current text)",
      "sample_or_method": "Federal regulation text",
      "geography": "US",
      "status": "Reviewed",
      "checked_on": "2026-11-03",
      "canonical_url": "https://contractsconnected.com/data/mechanics-lien-statistics#far-28-102-1-payment-bond-150000",
      "cite_as": "Cite as: Contracts Connected, \"Federal payment bond line for construction contracts,\" Contracts Connected Data, https://contractsconnected.com/data/mechanics-lien-statistics#far-28-102-1-payment-bond-150000. Original source: General Services Administration, Department of Defense and NASA (FAR), FAR 28.102-1 Bonds or other security, statute (current text). Reviewed November 2026. Compilation licensed under CC BY 4.0.",
      "license": "https://creativecommons.org/licenses/by/4.0/",
      "changelog": [
        {
          "date": "2026-11-03",
          "type": "Added",
          "note": "Checked against the original source."
        }
      ]
    },
    {
      "id": "levelset-2012-64-percent-lien-claims-paid-claim-check",
      "title": "Claim check: \"64% of lien claims were paid within 3 months\"",
      "section": "Claim checks: where widely repeated figures came from",
      "kind": "claim_check",
      "statistic": "64% of lien claims paid within 3 months",
      "wording": "'64% of lien claims were paid within 3 months' and 'it worked 64% of the time'",
      "limit": "It does not show a current rate, a national rate, or how many liens were filed or enforced.",
      "source_publisher": "Levelset (a Procore company)",
      "source_title": "Blog post (September 6, 2012, updated November 4, 2019)",
      "source_url": "https://www.levelset.com/blog/funnel-graphic-shows-how-mechanics-lien-claims-are-resolved/",
      "source_year": "2012",
      "sample_or_method": "Levelset's own undated survey; no sample size, method or year on the page.",
      "geography": "",
      "status": "Claim check: not cited as a finding",
      "checked_on": "2026-11-03",
      "canonical_url": "https://contractsconnected.com/data/mechanics-lien-statistics#levelset-2012-64-percent-lien-claims-paid-claim-check",
      "cite_as": "",
      "license": "https://creativecommons.org/licenses/by/4.0/",
      "changelog": [
        {
          "date": "2026-11-03",
          "type": "Added",
          "note": "Checked against the original source."
        }
      ]
    },
    {
      "id": "levelset-2019-lien-threats-98-vs-95-claim-check",
      "title": "Claim check: Levelset 2019, contractors who \"threaten to file\" a lien, 98% versus 95%",
      "section": "Claim checks: where widely repeated figures came from",
      "kind": "claim_check",
      "statistic": "Levelset 2019 lien threats: 98% versus 95%",
      "wording": "Contractors who 'threaten to file' a lien",
      "limit": "It does not say which figure is right, and the page's two numbers are for slightly different questions.",
      "source_publisher": "Levelset (a Procore company) with QuickBooks Time",
      "source_title": "Payment Issues, Problems, & Cash Stress Contractors & Subs Deal With (2019 National Construction Payments Report), published October 14, 2019",
      "source_url": "https://levelset.com/blog/2019-national-construction-payments-report",
      "source_year": "2019",
      "sample_or_method": "Survey of 503 construction professionals, August 2019.",
      "geography": "",
      "status": "Claim check: not cited as a finding",
      "checked_on": "2026-11-03",
      "canonical_url": "https://contractsconnected.com/data/mechanics-lien-statistics#levelset-2019-lien-threats-98-vs-95-claim-check",
      "cite_as": "",
      "license": "https://creativecommons.org/licenses/by/4.0/",
      "changelog": [
        {
          "date": "2026-11-03",
          "type": "Added",
          "note": "Checked against the original source."
        }
      ]
    }
  ]
}